Annual Hours of Delay/Mile: 144,453 Annual Congestion Cost: $15,618,993 County: Smith Previous Rankings: 87
Projects
Corridor Specific:
No improvements are currently planned.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Tyler – FM 756 expansion
Project Types: Capacity Expansion, Grade SeparationThis project will widen FM 756 (Paluxy Drive) in Tyler from Jeff Davis Drive, south to FM 344. The parallel roadway to US 69 is currently 2 lanes and will be widened to a 4 lane section with a continuous left turn lane. A grade separated interchange is proposed at the intersection of FM 756 and FM 346.
Project Details
- CSJ Number(s) or MTP Reference Numbers: CSJ 0492-04-034
- Cost Estimate: $52,000,000
- Let Date: FY 2026
- Completion Date: Unknown
- Project Data last modified: April 25, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers: CSJ 0492-04-041
- Cost Estimate: $35,000,000
- Let Date: FY 2026
- Completion Date: Unknown
- Project Data last modified: April 25, 2024
Phase 3
- CSJ Number(s) or MTP Reference Numbers: CSJ 0889-05-009
- Cost Estimate: $16,000,000
- Let Date: FY 2033
- Completion Date: Unknown
- Project Data last modified: April 25, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Tyler – FM 2493 Expansion
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection ImprovementsThis project will widen FM 2493 (Old Jacksonville Highway) from a 4 flush median section with continuous left turn lane to a 6 lane section with raised medians. A grade separated interchange is proposed at the Grande Boulevard intersection.
Project Details
- CSJ Number(s) or MTP Reference Numbers: CSJ 0191-03-084
- Cost Estimate: $194,000,000
- Let Date: FY 2028
- Completion Date: Unknown
- Project Data last modified: April 25, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 25, 2024
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled