Annual Hours of Delay/Mile: 930,722 Annual Congestion Cost: $128,786,963 County: Harris Previous Rankings: 5
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3A Design-Bid-Build
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNorth Houston Highway Improvement Project Segment 3A Design-Bid-Build: Depress and widen IH-69 from Spur 527 to SH 288, add intermittent frontage road in each direction. This project is part of the larger NHHIP.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0027-13-201
- Cost Estimate: $639,400,000
- Let Date: FY 2026
- Completion Date: 2031
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3D
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3D: IH-69: IH-45 Gulf Freeway to Buffalo Bayou: Depress and widen IH-69 from IH-45 Gulf Freeway to south of Buffalo Bayou. Reconstruct IH-69 interchanges with IH-45 Gulf Freeway. IH-45 Pierce Elevated: Re-align IH-45 from its current location on the west side of Downtown to be parallel with IH-69. Construct connectors on the west side of downtown providing access between the highway and local streets.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-598, 0500-03-601
- Cost Estimate: $1,578,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 69 PEL Study: SS 527 to SL 8 S
Project Types: Study, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/TollIH 69 Planning and Environmental Linkage Study: SS 527 to SL 8 S
Project Details
- MTP Reference Numbers: 0027-13-218
- Study Cost: $2,500,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
IH 69 Southwest Freeway Expansion from SS 527 to SL 8
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Operation ImprovementsReconstruct and widen from 8 to 10 main lanes on IH 69 from SS 527 to SL 8.
Project Details
- MTP Reference Numbers: 0027-13-236
- Cost Estimate: $1,000,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 69/IH 610 Direct Connectors
Project Types: Interchange/Intersection Improvements, Operation ImprovementsFive direct connectors at IH 69 and IH 610
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-17-145,146,157,161, 0027-13-210,211
- Cost Estimate: $258,800,000
- Let Date: FY 2017
- Completion Date: 2024
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3B
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3B: On SH 288 from south of IH-69 to IH-45 Gulf Freeway: Reconstruct the SH 288 interchange with IH-69. On IH-69 from SH 288 to IH-45 Gulf Freeway: Reconstruct and widen IH-69. On SH 288 managed lanes; reconstruct exit ramp.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0027-13-200, 0027-13-221, 0598-01-109
- Cost Estimate: $500,700,000
- Let Date: FY 2025
- Completion Date: 2029
- Project Data last modified: October 30, 2023
Parallel Corridors:
No improvements are currently planned.
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled