Annual Hours of Delay/Mile: 196,492 Annual Congestion Cost: $8,574,193 County: El Paso Previous Rankings: 1244
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
ITS Infra.@Zaragoza/BOTA POE
Project Type: Intelligent Transportation SystemsITS Infrastructure at Zaragoza and Bridge of the Americas Port of entries
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0924-06-620, MPO ID S502X
- Cost Estimate: $11,600,000
- Let Date: FY 2022
- Completion Date: 2024
- Project Data last modified: November 6, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 0924-06-619, MPO ID S501X
- Cost Estimate: $14,907,000
- Let Date: FY 2024
- Completion Date: 2026
- Project Data last modified: November 6, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10/US 54 Direct Connectors (I-10 Connect)
Project Types: Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/el-paso/i10-connect.html
US 54/IH10/IH110/LOOP 375 Interchange improvements (improvements to existing ramps and adding auxiliary lanes).
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0167-01-113 (I034X-MOD)
- Cost Estimate: $94,532,000
- Let Date: FY 2018
- Completion Date: 2023
- Project Data last modified: November 5, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 62 Montana and US 85 (Paisano Drive) Corridor Study
Project Types: Study, Access Management, Bicycle/Pedestrian Improvements, Bus Only Lanes, Incident Management, Integrated Corridor Management, Intelligent Transportation Systems, Interchange/Intersection Improvements, Local Bus Service, Operation Improvements, Other System Modification, Signal Operations/Management, Travel OptionsWebsite: https://www.txdot.gov/projects/hearings-meetings/el-paso/paisano-montana-study-101723.html
SL 375 Widening (SS601 to BU54A)
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Operation ImprovementsAdd 1 lane in each direction
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2552-02-029
- Cost Estimate: $33,885,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Global Reach Drive Upgrade to Highway (US 62/180 to SS 601)
Project Types: Access Management, Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Operation ImprovementsCSJ 0924-06-594, Upgrade existing facility to highway standards and develop grade separations. CSJ 0924-06-532, Construction of direct connectors, 2 lane frontage roads, and interchanges.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0924-06-532
- Cost Estimate: $24,700,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 0924-06-594
- Cost Estimate: $6,000,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SS 320 Borderland Expressway Study
Project Types: Study, Access Management, Bicycle/Pedestrian Improvements, Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Multimodal Transportation Center, Signal Operations/ManagementWebsite: https://www.txdot.gov/inside-txdot/projects/studies/el-paso/northeastpky-lp375-fm3325.html
SS 320 Borderland Expressway Study: New roadway to serve as Spur 320 or bypass to connect to New Mexico's Borderland Expressway proposed roadway. Associated CSJs: 0924-06-136, Borderland Expressway (Ultimate); Feasibility Study of Build 4 Lanes and Overpasses 0665-02-005, Borderland Expressway PHIII (BU54|SL375); Construct New Divided 4 Lane Facility from Railroad to SL 375 and Transitionary work from BU 54 (Dyer) to Railroad Drive 0665-02-004, Borderland Expressway PH II (FM3255|RR); Construct New Divided 4 Lane Facility between FM 3255 to Railroad Drive 0665-02-002, Spur 320 PH I (BU 54 | Railroad Dr); Borderland Expressway Phase I Construct Frontage Roads and Intersections between BU54 (Dyer Street ) to Railroad Drive
Project Details
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 0665-02-005
- Estimated Project Cost: $137,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Phase 3
- CSJ Number(s) or MTP Reference Numbers: 0665-02-004
- Estimated Project Cost: $137,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Phase 4
- CSJ Number(s) or MTP Reference Numbers: 0665-02-002
- Estimated Project Cost: $21,534,100
- Let Date: FY 2023
- Completion Date: Unknown
- Project Data last modified: November 5, 2023
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key