Annual Hours of Delay/Mile: 133,156 Annual Congestion Cost: $12,739,106 County: Travis Previous Rankings: 203
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 North
Project Types: Capacity Expansion, Operation Improvements, Travel OptionsWebsite: http://www.183north.com/
Add two express lanes in each direction, a fourth general purpose lane, and direct connectors from US 183 to Loop 1.
Project Details
- CSJ Number(s): 0151-06-143,0151-06-142, 0151-05-113, 0151-05-114, 3136-01-187
- Cost Estimate: $612,000,000
- Let Date: FY 2021
- Completion Date: 2026
- Project Data last modified: April 22, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 Ramp Closure
Project Types: Capacity Expansion, Operation ImprovementsOverlay and restripe to add northbound and southbound auxiliary lane from Metric Blvd to IH 35. Incidental work at US 183 NBFR/Lamar Intersection.
Project Details
- CSJ Number(s): 0151-06-149
- Cost Estimate: $4,000,000
- Let Date: FY 2020
- Completion Date: 2021
- Project Data last modified: November 15, 2021
Highway Emergency Response Operator (HERO) Patrol Service
Project Type: Incident ManagementThe Highway Emergency Response Operator (HERO) Patrol Service, operated by CTRMA in partnership with TxDOT and the Texas A&M Transportation Institute, will provide incident management service along IH 35 traffic from Round Rock to Buda.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from Rundberg Lane to US 290E
Project Types: Bicycle/Pedestrian Improvements, Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: http://www.my35.org/capital-project-rundberg-us290e.htm
Construct 3 new direct connectors at I-35 and US 183, improve existing NB to NB direct connector, and make other operational improvements.
Project Details
- CSJ Number(s): 0015-13-382, 0015-13-387
- Cost Estimate: $124,000,000
- Let Date: FY 2017
- Completion Date: 2022
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from RM 1431 to SH 45N
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsConstruct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, direct connectors at SH 45N, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-09-178
- Cost Estimate: $336,310,000
- Let Date: FY 2029
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Regionally:
Regional Travel Options
The Commute Solutions program will promote the use of teleworking, flexible schedules, carpooling, vanpooling, public transit, walking, biking, and reducing barriers to alternative commuting. All routine passenger travel with an origin or destination within the six counties of the CAMPO MPA is considered within the scope of this project. This project consists of six tasks: 1) regional program coordination and outreach; 2) commuter education and enrollment campaigns; 3) ride-sharing/trip-planning tools; 4) regional commuting surveys; 5) grants and training to support local and sub-regional TOM activities, and 6) applied research into innovative regional TOM strategies and performance measurement.
Project Details
- CSJ Number(s): 0914-00-423
- Cost Estimate: $312,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 12, 2019
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Project Connect
Project Types: Access Management, Bus Rapid Transit, Commuter/Light Rail, Express Bus Service, Local Bus Service, Multimodal Transportation Center, Operation Improvements, Park-and-Ride, Travel OptionsWebsite: http://www.projectconnect.com/
Project Connect is a vision for Central Texas’ high-capacity transit system linking activity centers within the fastest growing region in the country and aims to connect people, places, and opportunities in an easy and efficient way.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled