Annual Hours of Delay/Mile: 164,881 Annual Congestion Cost: $31,224,857 County: Williamson Previous Rankings: 204
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 North
Project Types: Capacity Expansion, Operation Improvements, Travel OptionsWebsite: http://www.183north.com/
Add two express lanes in each direction, a fourth general purpose lane, and direct connectors from US 183 to Loop 1.
Project Details
- CSJ Number(s): 0151-06-143,0151-06-142, 0151-05-113, 0151-05-114, 3136-01-187
- Cost Estimate: $612,000,000
- Let Date: FY 2021
- Completion Date: 2026
- Project Data last modified: April 22, 2024
Highway Emergency Response Operator (HERO) Patrol Service
Project Type: Incident ManagementThe Highway Emergency Response Operator (HERO) Patrol Service, operated by CTRMA in partnership with TxDOT and the Texas A&M Transportation Institute, will provide incident management service along IH 35 traffic from Round Rock to Buda.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
City of Austin Corridor Mobility Program – Burnet Road
Project Type: Bicycle/Pedestrian ImprovementsWebsite: https://data.austintexas.gov/stories/s/Corridor-Mobility-Program/gukj-e8fh/
Proposed raised median with a rehab sidewalk and dedicated or Shared Use Path Bike Lane along Burnet Road from Koenig Lane and MoPac Expressway.
Project Details
- CSJ Number(s) or MTP Reference Numbers:
- Cost Estimate: $22,000,000
- Let Date: FY 2027
- Completion Date: Unknown
- Project Data last modified: July 25, 2023
Regionally:
Regional Travel Options
The Commute Solutions program will promote the use of teleworking, flexible schedules, carpooling, vanpooling, public transit, walking, biking, and reducing barriers to alternative commuting. All routine passenger travel with an origin or destination within the six counties of the CAMPO MPA is considered within the scope of this project. This project consists of six tasks: 1) regional program coordination and outreach; 2) commuter education and enrollment campaigns; 3) ride-sharing/trip-planning tools; 4) regional commuting surveys; 5) grants and training to support local and sub-regional TOM activities, and 6) applied research into innovative regional TOM strategies and performance measurement.
Project Details
- CSJ Number(s): 0914-00-423
- Cost Estimate: $312,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 12, 2019
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Project Connect
Project Types: Access Management, Bus Rapid Transit, Commuter/Light Rail, Express Bus Service, Local Bus Service, Multimodal Transportation Center, Operation Improvements, Park-and-Ride, Travel OptionsWebsite: http://www.projectconnect.com/
Project Connect is a vision for Central Texas’ high-capacity transit system linking activity centers within the fastest growing region in the country and aims to connect people, places, and opportunities in an easy and efficient way.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled