Annual Hours of Delay/Mile: 134,878 Annual Congestion Cost: $21,129,466 County: Harris Previous Rankings: 143
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Hardy Toll Road/Beltway 8 Direct Connectors
Project Types: Interchange/Intersection Improvements, Operation ImprovementsDirect connectors linking the Hardy Toll Road to Beltway 8 will enable drivers to transit between the two roads without having to stop at traffic lights, improving mobility in the area.
Project Details
- MTP Reference Numbers: 0912-72-609
- Cost Estimate: $73,400,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 8 from N of US 90 to Woodforest Blvd- Widening
Project Type: Capacity ExpansionWiden from 4 to 8 lanes
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3256-03-104
- Cost Estimate: $50,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: November 1, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 8 from S of IH 10 (E) to N Woodforest Blvd Restriping
Project Types: Study, Capacity ExpansionRestripe from 6 to 8 lanes
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3256-03-096
- Estimated Project Cost: $460,000
- Let Date: FY 2022
- Completion Date: 2024
- Project Data last modified: November 1, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Hardy Toll Road Downtown Connector
Project Types: Capacity Expansion, Managed Lanes/TollThe Hardy Downtown Connector project will extend the Hardy Toll Road from its current terminus at IH 610 North into downtown Houston and will consist of four toll lanes (two in each direction) for 3.6 miles. HCTRA recently reached the necessary agreements for the relocation of the rail line, an important milestone for the progression of this project, which will be completed in two phases. Phase I will include the relocation of the Houston Belt and; Terminal rail lines (completed in the fall of 2014), followed by the construction of overpasses at Quitman and Collingsworth, and an underpass at Lorraine Street to eliminate at-grade crossings. Phase II will be the construction of the toll lanes.
Project Details
- MTP Reference Numbers: 0912-72-608
- Cost Estimate: $250,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 1-B, 1-C and 1-D
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsNHHIP Segment 1-B, 1-C and 1-D: Reconstruct existing IH-45 eight general purpose lanes (4 in each direction). Reconstruct and widen existing reversible single lane high-occupancy vehicle facility to be four lanes (2 in each direction) for high-occupancy and transit vehicles. Reconstruct and widen existing four frontage road lanes (2 in each direction) to be six lanes (3 in each direction). Reconstruct two direct connectors at IH-45 and Beltway 8 Interchange.
Project Details
- MTP Reference Numbers: 0500-03-446, 0110-06-132, 0110-06-139
- Cost Estimate: $1,306,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled