Annual Hours of Delay/Mile: 217,128 Annual Congestion Cost: $36,248,322 County: Bexar Previous Rankings: 60
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 16 @ SL 1604 Intersection Improvements
Project Types: Bicycle/Pedestrian Improvements, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh16-loop1604.html
Innovative Intersection Improvements - Continuous flow intersection will provide enhance safety, and improve travel time.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 245201064
- Cost Estimate: $7,700,000
- Let Date: FY 2017
- Completion Date: 2020
- Project Data last modified: January 29, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 1604 Feasibility Study SH 151 to SH 16
Project Types: Study, Capacity Expansion, Interchange/Intersection Improvements, Operation ImprovementsFeasibility study for operational improvements along SL 1604 from SH 151 to SH 16.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2452-01-068
- Study Cost: $22,900,000
- Let Date: FY 2033
- Completion Date: Unknown
- Project Data last modified: February 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 1604 – Expansion SH 16 to IH 35
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/092319.html
Design-Bid-Build to expand existing expressway to add 6 additional lanes 4 GP and 2 HOV Special Purpose Lanes and Direct Connectors at I 10 interchange
Project Details
- CSJ Number(s) or MTP Reference Numbers: 245202083
- Cost Estimate: $148,000,000
- Let Date: FY 2021
- Completion Date: 2024
- Project Data last modified: February 1, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 245202128
- Cost Estimate: $200,000,000
- Let Date: FY 2021
- Completion Date: 2025
- Project Data last modified: February 1, 2024
Phase 3
- CSJ Number(s) or MTP Reference Numbers: 245202117
- Cost Estimate: $43,700,000
- Let Date: FY 2021
- Completion Date: 2025
- Project Data last modified: February 1, 2024
Phase 4
- CSJ Number(s) or MTP Reference Numbers: 007208144
- Cost Estimate: $418,000,000
- Let Date: FY 2022
- Completion Date: 2027
- Project Data last modified: February 1, 2024
Phase 5
- CSJ Number(s) or MTP Reference Numbers: 245202130
- Cost Estimate: $55,000,000
- Let Date: FY 2023
- Completion Date: 2026
- Project Data last modified: February 1, 2024
Phase 6
- CSJ Number(s) or MTP Reference Numbers: 245203113
- Cost Estimate: $126,000,000
- Let Date: FY 2023
- Completion Date: 2026
- Project Data last modified: February 1, 2024
Phase 7
- CSJ Number(s) or MTP Reference Numbers: 245203087
- Cost Estimate: $180,000,000
- Let Date: FY 2024
- Completion Date: 2027
- Project Data last modified: February 1, 2024
Phase 8
- CSJ Number(s) or MTP Reference Numbers: 245203128
- Cost Estimate: $166,000,000
- Let Date: FY 2028
- Completion Date: 2031
- Project Data last modified: February 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I10 West La Cantera Parkway to Ralph Fair Road
Website: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/i10-fm3351-la-cantera-pkwy.htmlTxDOT is expanding I 10 from Ralph Fair Road ( FM 3351) to La Cantera Parkway in San Antonio Bexar County Texas from 4 main lanes to eight mainlanes by adding one general purpose lane and one high occupancy lane each way.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0072-08-089/0072-08-089
- Cost Estimate: $66,000,000
- Let Date: FY 2017
- Completion Date: 2020
- Project Data last modified: April 28, 2021
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 28, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 10 East from I 410 to SL 1604
Project Type: Capacity ExpansionDesign-Bid-Build I-10 East (From I-410 to Loop 1604) improvements consist of reconstructing and expanding the main lanes from 4 lanes to 6 lanes, and also consist of reconstructing and converting the frontage roads to one-way, as well as ramp and intersection reconfiguration for safer and more efficient operation.
Project Details
- CSJ Number(s): 002502160
- Cost Estimate: $109,000,000
- Let Date: FY 2018
- Completion Date: 2021
- Project Data last modified: July 31, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 10 HOV Special Use Study
Project Types: Study, Capacity Expansion, Operation ImprovementsFeasibility study to determine future transportation envelope and operational improvements
Project Details
- CSJ Number(s) or MTP Reference Numbers: 007208142
- Study Cost: $780,000
- Let Date: FY 2018
- Completion Date: 2020
- Project Data last modified: July 31, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 007212199
- Study Cost: $2,860,000
- Let Date: FY 2018
- Completion Date: 2020
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 16 (Bandera Road) CMAQ Super Street Project
Project Types: Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/fm-1560-sh16.html
From FM 1560 to SL 1604 R-Cut Design with improved intersection through-put using limited left turns and other intersection improvements sometimes referred to as a Super Street project .
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0291-10-114
- Cost Estimate: $17,300,000
- Let Date: FY 2022
- Completion Date: 2026
- Project Data last modified: July 29, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Feasibility Study
Project Types: Study, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh16-banderaroad-I-410-loop1604.html
A feasibility study to consider options for improving mobility along SH 16/Bandera Road.
Project Details
- CSJ Number(s):
- Study Cost: $5,000,000
- Let Date: Unknown
- Completion Date: 2016
- Project Data last modified: July 27, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Operational Improvements
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/projects/projects-studies/san-antonio/sh16-bandera-road-i410-loop1604.html
Operational Improvements between I 410 and Guilbeau Road and Guilbeau Road to LP 1604
Project Details
- CSJ Number(s) or MTP Reference Numbers: 029110100
- Cost Estimate: $65,000,000
- Let Date: FY 2044
- Completion Date: Unknown
- Project Data last modified: November 6, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 029110099
- Cost Estimate: $35,000,000
- Let Date: FY 2044
- Completion Date: Unknown
- Project Data last modified: November 6, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
FM 1560 expansion (from Galm/Shaenfield to FM 471)
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/013019.html
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Project Details
- CSJ Number(s) or MTP Reference Numbers: 223001020
- Cost Estimate: $21,000,000
- Let Date: FY 2026
- Completion Date: 2028
- Project Data last modified: February 8, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
FM 1560 Expansion (from SH 16 to Galm/Shaenfield)
Project Types: Bicycle/Pedestrian Improvements, Capacity ExpansionWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/013019.html
Expand 2 lanes to 4 lanes with turn lanes, bike accommodations and sidewalks
Project Details
- CSJ Number(s) or MTP Reference Numbers: 223001021
- Cost Estimate: $39,500,000
- Let Date: FY 2026
- Completion Date: 2028
- Project Data last modified: July 31, 2023
Regionally:
Highway Emergency Response Operations (HERO)
Provide emergency response service along I 35, US 281, I 10 , I 37, LP 410. Provide assistance to disabled vehicles and crashes.
Project Details
- CSJ Number(s): 0915-00-212
- Cost Estimate: $2,500,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 2
- CSJ Number(s): 0915-00-213
- Cost Estimate: $5,500,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 3
- CSJ Number(s): 0915-00-214
- Cost Estimate: $5,500,000
- Let Date: FY 2021
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 4
- CSJ Number(s): 0915-00-227
- Cost Estimate: $5,500,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Advance Traveler Information System
Advance Traveler Information Systems - Congestion Management System System DMS to give travel time information on all Controlled Access Facilities. IH 10, IH 35, IH 37, IH 410, US 90 AND US 281
Project Details
- CSJ Number(s): 091512577
- Cost Estimate: $4,900,000
- Let Date: FY 2018
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
ITS – US 281 and SL 1604
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, emergency management. Install CCTV, DMS, Vehicle Detection using fiber. US 281 (Nakoma to SL 1604) ; SL 1604 (I 10 -US 281) and SL 1604 (US 281-I 35)
Project Details
- CSJ Number(s): 025304158
- Cost Estimate: $1,600,000
- Let Date: FY 2019
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
VIA Frequency Program CMAQ
Provide improved bus frequency along US 281 (Route 7) and I 410 (Route 552) ; increased frequency has a direct link to increase ridership which could reduce VMT or at least hold it steady and population increase.
Project Details
- CSJ Number(s): 091512673
- Cost Estimate: $7,037,144
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 5, 2020
Phase 2
- CSJ Number(s): 091512680
- Cost Estimate: $2,181,429
- Let Date: FY 2021
- Completion Date: Unknown
- Project Data last modified: February 5, 2020
Phase 3
- CSJ Number(s): 091512686
- Cost Estimate: $2,181,427
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: February 5, 2020
Planned for Transit:
No improvements are currently planned.