Annual Hours of Delay/Mile: 274,316 Annual Congestion Cost: $69,950,863 County: Travis Previous Rankings: 65
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 1 Barton Skyway to SL 360
Project Types: Access Management, Interchange/Intersection Improvements, Operation ImprovementsExtend Southbound auxiliary lane and reconstruct 4 southbound ramps
Project Details
- CSJ Number(s) or MTP Reference Numbers: 313601193
- Cost Estimate: $6,903,000
- Let Date: FY 2023
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
MoPac South Environmental Study
Project Type: Managed Lanes/TollWebsite: HTTP://WWW.MOPACSOUTH.COM
Reconstruct Loop 1 from FM 734 to Cesar Chavez (Phase 1) and from Cesar Chavez to Slaughter Lane (Phase 2) adding managed lanes in each direction. Transit buses and registered vanpools will be able to use the managed lanes without a toll while carpools and single occupant vehicles will pay a toll.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3136-01-107
- Cost Estimate: $171,000,000
- Let Date: FY 2012
- Completion Date: 2017
- Project Data last modified: November 29, 2022
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 3136-01-176
- Cost Estimate: $825,000,000
- Let Date: FY 2024
- Completion Date: 2027
- Project Data last modified: November 29, 2022
Highway Emergency Response Operator (HERO) Patrol Service
Project Type: Incident ManagementThe Highway Emergency Response Operator (HERO) Patrol Service, operated by CTRMA in partnership with TxDOT and the Texas A&M Transportation Institute, will provide incident management service along IH 35 traffic from Round Rock to Buda.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 North
Project Types: Capacity Expansion, Operation Improvements, Travel OptionsWebsite: http://www.183north.com/
Add two express lanes in each direction, a fourth general purpose lane, and direct connectors from US 183 to Loop 1.
Project Details
- CSJ Number(s): 0151-06-143,0151-06-142, 0151-05-113, 0151-05-114, 3136-01-187
- Cost Estimate: $612,000,000
- Let Date: FY 2021
- Completion Date: 2026
- Project Data last modified: April 22, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 South
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsWebsite: https://www.183south.com/
Reconstruct US 183 (Bergstrom Expressway) from US 290 to SH 71 as a 6-lane toll facility while improving turning movements, travel patterns, and capacity. The environmental study began in 2011 and was cleared in 2015. Phase 1 from TechniCenter to US 290E opened to the public in 2019. Phase 2 from TechniCenter to SH 71 is projected to be open to the public in 2021.
Project Details
- MTP Reference Numbers: 0151-09-036
- Cost Estimate: $743,000,000
- Let Date: FY 2015
- Completion Date: 2021
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 Capital Express North Project
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://my35capex.com/
Construct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-10-062, 0015-13-389
- Cost Estimate: $573,748,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 Capital Express Central Project
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://my35capex.com/
Construct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-14-428, 0015-13-433, 0015-13-423, 0015-13-442
- Cost Estimate: $3,258,050,000
- Let Date: FY 2025
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Cost Estimate: $2,000,000,000
- Let Date: FY 2026
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from Holly Street to US 290/SH 71
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://my35capex.com/projects/i-35-capital-express-central/
Reconstruct IH 35 mainlanes and frontage roads from Holly St. to SH 71, add northbound and southbound non-tolled managed lanes, reconstruct ramps, improve frontage road, reconstruct intersections and bridges at Riverside, Woodland Ave. and Lady Bird Lake.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-13-428
- Cost Estimate: $267,857,000
- Let Date: FY 2024
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
City of Austin Corridor Mobility Program – Burnet Road
Project Type: Bicycle/Pedestrian ImprovementsWebsite: https://data.austintexas.gov/stories/s/Corridor-Mobility-Program/gukj-e8fh/
Proposed raised median with a rehab sidewalk and dedicated or Shared Use Path Bike Lane along Burnet Road from Koenig Lane and MoPac Expressway.
Project Details
- CSJ Number(s) or MTP Reference Numbers:
- Cost Estimate: $22,000,000
- Let Date: FY 2027
- Completion Date: Unknown
- Project Data last modified: July 25, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
City of Austin Corridor Mobility Program – North Lamar
Project Types: Bicycle/Pedestrian Improvements, Operation Improvements, Signal Operations/ManagementWebsite: https://data.austintexas.gov/stories/s/Corridor-Mobility-Program/gukj-e8fh/
Proposed raised median with a rehab sidewalk and dedicated or Shared Use Path Bike Lane along North Lamar from US 183 to Howard Lane.
Project Details
- CSJ Number(s): 0011-11-067, 0011-11-068
- Cost Estimate: $13,552,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: November 11, 2020
Regionally:
Bicycle/Pedestrian Improvements
Improve bicycle and pedestrian infrastructure throughout the CAMPO region using $444 million through 2035.
Project Details
- MTP Reference Numbers:
- Cost Estimate: $444,000,000
- Let Date: Unknown
- Completion Date: 2035
- Project Data last modified: October 17, 2018
Operational Improvements
These include intersection improvements, ramp modifications, frontage road signal adjustments, and general ITS applications.
Regional Travel Options
The Commute Solutions program will promote the use of teleworking, flexible schedules, carpooling, vanpooling, public transit, walking, biking, and reducing barriers to alternative commuting. All routine passenger travel with an origin or destination within the six counties of the CAMPO MPA is considered within the scope of this project. This project consists of six tasks: 1) regional program coordination and outreach; 2) commuter education and enrollment campaigns; 3) ride-sharing/trip-planning tools; 4) regional commuting surveys; 5) grants and training to support local and sub-regional TOM activities, and 6) applied research into innovative regional TOM strategies and performance measurement.
Project Details
- CSJ Number(s): 0914-00-423
- Cost Estimate: $312,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 12, 2019
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Project Connect
Project Types: Access Management, Bus Rapid Transit, Commuter/Light Rail, Express Bus Service, Local Bus Service, Multimodal Transportation Center, Operation Improvements, Park-and-Ride, Travel OptionsWebsite: http://www.projectconnect.com/
Project Connect is a vision for Central Texas’ high-capacity transit system linking activity centers within the fastest growing region in the country and aims to connect people, places, and opportunities in an easy and efficient way.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled