Annual Hours of Delay/Mile: 145,790 Annual Congestion Cost: $18,835,578 County: Harris Previous Rankings: 129
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 6 Expansion: Memorial to Richmond
Project Types: Access Management, Capacity ExpansionReconstruct to an 8-lane divided arterial with curb and gutter from Memorial to Richmond.
Project Details
- MTP Reference Numbers: 1685-05-081,100
- Cost Estimate: $67,200,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Parallel Corridors:
SH 6 from Clay Rd to IH 10- Widen from 6 to 8 lanes
Project Types: Capacity Expansion, Operation ImprovementsWiden from 6 to 8 lanes
Project Details
- MTP Reference Numbers: 1685-05-138
- Cost Estimate: $91,800,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: November 1, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 6/Clay Road Grade Separation and Intersection Improvements
Project Types: Grade Separation, Interchange/Intersection Improvements, Operation ImprovementsConstruct grade separation and Intersection improvements on SH 6 at Clay Road.
Project Details
- MTP Reference Numbers: 1685-05-107
- Cost Estimate: $28,000,000
- Let Date: FY 2029
- Completion Date: 2031
- Project Data last modified: November 1, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled