Annual Hours of Delay/Mile: 157,198 Annual Congestion Cost: $23,629,418 County: Harris Previous Rankings: 712
Projects
Corridor Specific:
No improvements are currently planned.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 S from SH 35 (SS 5/Mykawa) to SH 288
Project Types: Capacity Expansion, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements. Reconstruct IH-610 South Loop Freeway from SH 288 to SH 35 (SS 5/Mykawa) • Upgrade the reconstructed roadway to meet current design criteria. • Address frontage road connectivity. • Provide appropriate connections to the proposed SH 35 project
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-16-159, 0271-16-138, 0271-16-139
- Cost Estimate: $175,500,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
FM 521/FM 2234 Widening
Project Types: Capacity Expansion, Grade Separation, Operation ImprovementsWiden to a 4-lane divided roadway with two railroad grade separations on FM 521/FM 2234 from BW 8 to south of FM 2234.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0111-03-031, 0111-01-067, 2105-01-048
- Cost Estimate: $34,500,000
- Let Date: FY 2018
- Completion Date: 2022
- Project Data last modified: November 15, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 at SH 288 Reconstruct Main Lanes and Construct Overpass
Project Types: Capacity Expansion, Grade Separation, Operation ImprovementsIH 610 at SH 288 (W of Cambridge to W of Scott St) reconstruct main lanes, frontage road and construct overpass at Cambridge St/Almeda Rd/UPRR.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-16-140
- Cost Estimate: $116,900,000
- Let Date: FY 2019
- Completion Date: 2025
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 S from IH 45 to SH 35 (SS 5/Mykawa)
Project Types: Capacity Expansion, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsIH 610 S from IH 45 to SH 35 (SS 5/Mykawa) - reconstruct freeway including TSM improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-16-158
- Cost Estimate: $102,400,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3A Design-Bid-Build
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNorth Houston Highway Improvement Project Segment 3A Design-Bid-Build: Depress and widen IH-69 from Spur 527 to SH 288, add intermittent frontage road in each direction. This project is part of the larger NHHIP.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0027-13-201
- Cost Estimate: $639,400,000
- Let Date: FY 2026
- Completion Date: 2031
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3B
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3B: On SH 288 from south of IH-69 to IH-45 Gulf Freeway: Reconstruct the SH 288 interchange with IH-69. On IH-69 from SH 288 to IH-45 Gulf Freeway: Reconstruct and widen IH-69. On SH 288 managed lanes; reconstruct exit ramp.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0027-13-200, 0027-13-221, 0598-01-109
- Cost Estimate: $500,700,000
- Let Date: FY 2025
- Completion Date: 2029
- Project Data last modified: October 30, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled