Annual Hours of Delay/Mile: 208,937 Annual Congestion Cost: $17,831,598 County: Dallas Previous Rankings: 192
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Irving Interchange
Project Types: Access Management, Bicycle/Pedestrian Improvements, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/dallas/irving-interchange.html
Reconstruction of the interchanges at SH183, SH114, SL 12, and SPUR 482. Constructing continuous frontage roads through the interchanges. Reconstructing general purpose lanes on SL 12 from Union Bower Road to SH 183.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0581-02-124, 0094-03-060
- Cost Estimate: $32,000,000
- Let Date: FY 2020
- Completion Date: 2025
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Midtown Express (SH 183) Widening
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Managed Lanes/TollIncrease capacity with the addition of TEXpress (toll managed) Lanes and reconstruct portions of general purpose lanes and frontage roads on SH 183 (from SH 121 to I-35E), SH 114 (from SH 183 to International Pkwy) and Loop 12 (from SH 183 to I-35E). SH 183 (Interim): One TEXpress (toll/managed) Lane each direction on SH 183 from SH 121 to I-35E; reconstruct portions of the general purpose (GP) lanes and frontage roads. SH 114 (Interim): Widen to accommodate one WB TEXpress Lane International Parkway to SH 161/PGBT (ties to DFW Connector): widen to accommodate one TEXpress Lane in each direction SH 161/PGBT to SH 183. Loop 12 (Interim): Addition of one TEXpress Lane in each direction from SH 183 to I-35E
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0094-03-065,0094-03-116,0094-03-105,0094-07-015,0094-02-077,0094-07-020,0364-05-025,0581-02-124,0581-02-128
- Cost Estimate: $847,600,000
- Let Date: FY 2015
- Completion Date: 2019
- Project Data last modified: May 1, 2024
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 114 – Irving
Project Types: Access Management, Bicycle/Pedestrian Improvements, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Operation ImprovementsThe project will reconstruct both the main lanes and the frontage roads through the corridor. SH 114 serves as the primary connection from the North DFW Airport area to downtown Dallas and experience heavy congestion currently. In addition, there has been substantial development along the corridor.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0353-04-111, 0353-04-112, 0353-06-063, 0353-06-067
- Cost Estimate: $683,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Loop 12 from Spur 408 to SH 183
Project Types: Study, Access Management, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsThe Loop 12 study from Spur 408 to SH 183 will reconstruct and widen the main lanes from 6 to 8. In addition, the project will reconstruct the existing discontinuous frontage roads to a continuous 4/6 lane configuration. The project will re-construct the I-30 interchange at Loop 12.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0581-02-077
- Estimated Project Cost: $587,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Lower Stemmons: I-35E from I-30 to SH 183 (Formerly Project Pegasus)
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsUltimate operational improvements consisting collector-distributor roads (north an southbound), direct connectors, and reconstructed ramps, mainlanes and bridge structures as necessary to maximize capacity without proposed Trinity Parkway alleviating additional traffic volume. Project Pegasus included Lower Stemmons, The Horseshoe and the Canyon. The project as environmentally clear in 2005. Pegasus was a starting point for the current schematic development.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0094-07-046, 0196-03-199, 0196-03-266
- Cost Estimate: $175,720,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: May 1, 2024
Regionally:
Regional Trip Reduction Program
This program includes funding for the vanpool program, bike/pedestrian improvements, and sustainable development initiatives.
ITS
Develop a regional data and video communication system to aid in the flow of regional ITS information to partners in the DFW region, including individual agency connections & hardware needs for the regional network.
Regional Mobility Assistance Patrol
Mobility assistance patrols that provide assistance to stranded motorists due to vehicle problems or non-injury accidents.
Operational Improvements
These include intersection improvements, ramp additions, auxiliary lanes, HOV extensions, and general ITS applications.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled