Annual Hours of Delay/Mile: 263,263 Annual Congestion Cost: $17,695,919 County: Dallas Previous Rankings: 91
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Midtown Express (SH 183) Widening
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Managed Lanes/TollIncrease capacity with the addition of TEXpress (toll managed) Lanes and reconstruct portions of general purpose lanes and frontage roads on SH 183 (from SH 121 to I-35E), SH 114 (from SH 183 to International Pkwy) and Loop 12 (from SH 183 to I-35E). SH 183 (Interim): One TEXpress (toll/managed) Lane each direction on SH 183 from SH 121 to I-35E; reconstruct portions of the general purpose (GP) lanes and frontage roads. SH 114 (Interim): Widen to accommodate one WB TEXpress Lane International Parkway to SH 161/PGBT (ties to DFW Connector): widen to accommodate one TEXpress Lane in each direction SH 161/PGBT to SH 183. Loop 12 (Interim): Addition of one TEXpress Lane in each direction from SH 183 to I-35E
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0094-03-065,0094-03-116,0094-03-105,0094-07-015,0094-02-077,0094-07-020,0364-05-025,0581-02-124,0581-02-128
- Cost Estimate: $847,600,000
- Let Date: FY 2015
- Completion Date: 2019
- Project Data last modified: May 1, 2024
Parallel Corridors:
No improvements are currently planned.
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.