Annual Hours of Delay/Mile: 94,578 Annual Congestion Cost: $19,310,135 County: Bexar Previous Rankings: 96
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 16 (Bandera Road) CMAQ Super Street Project
Project Types: Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/fm-1560-sh16.html
From FM 1560 to SL 1604 R-Cut Design with improved intersection through-put using limited left turns and other intersection improvements sometimes referred to as a Super Street project .
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0291-10-114
- Cost Estimate: $17,300,000
- Let Date: FY 2022
- Completion Date: 2026
- Project Data last modified: July 29, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
My Link – Bandera Road Sidewalks
Project Type: Bicycle/Pedestrian ImprovementsInstall Sidewalks along Bandera Road between Braun Road and East Rolling Ridge Drive to improve connections to Transit
Project Details
- CSJ Number(s): 0915-12-687
- Cost Estimate: $4,000,000
- Let Date: FY 2020
- Completion Date: 2022
- Project Data last modified: April 28, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Improve Traffic Signals on SH 16/Bandera Road
Project Type: Signal Operations/ManagementCity Project to improve Traffic Signal Improvements and Safety Lighting
Project Details
- CSJ Number(s): 029110104
- Cost Estimate: $282,000
- Let Date: FY 2019
- Completion Date: 2020
- Project Data last modified: January 29, 2021
Phase 2
- CSJ Number(s): 029110105
- Cost Estimate: $304,000
- Let Date: FY 2019
- Completion Date: 2020
- Project Data last modified: January 29, 2021
Phase 3
- CSJ Number(s): 029110106
- Cost Estimate: $333,000
- Let Date: FY 2019
- Completion Date: 2020
- Project Data last modified: January 29, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Operational Improvements
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/projects/projects-studies/san-antonio/sh16-bandera-road-i410-loop1604.html
Operational Improvements between I 410 and Guilbeau Road and Guilbeau Road to LP 1604
Project Details
- CSJ Number(s) or MTP Reference Numbers: 029110100
- Cost Estimate: $65,000,000
- Let Date: FY 2044
- Completion Date: Unknown
- Project Data last modified: November 6, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 029110099
- Cost Estimate: $35,000,000
- Let Date: FY 2044
- Completion Date: Unknown
- Project Data last modified: November 6, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 16 @ SL 1604 Intersection Improvements
Project Types: Bicycle/Pedestrian Improvements, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh16-loop1604.html
Innovative Intersection Improvements - Continuous flow intersection will provide enhance safety, and improve travel time.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 245201064
- Cost Estimate: $7,700,000
- Let Date: FY 2017
- Completion Date: 2020
- Project Data last modified: January 29, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Feasibility Study
Project Types: Study, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh16-banderaroad-I-410-loop1604.html
A feasibility study to consider options for improving mobility along SH 16/Bandera Road.
Project Details
- CSJ Number(s):
- Study Cost: $5,000,000
- Let Date: Unknown
- Completion Date: 2016
- Project Data last modified: July 27, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Traffic Signal Timing
Project Types: Interchange/Intersection Improvements, Operation ImprovementsA traffic signal timing project on Bandera Road was completed in the summer of 2014, providing synchronization of the lights between the City of Leon Valley and the City of San Antonio, to improve commute times along the corridor. Additional alternatives analyses are continuing to identify solutions to the congestion within this corridor.
Project Details
- CSJ Number(s):
- Let Date: Unknown
- Completion Date: 2014
- Project Data last modified: August 22, 2016
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
FM 1560 Expansion (from SH 16 to Galm/Shaenfield)
Project Types: Bicycle/Pedestrian Improvements, Capacity ExpansionWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/013019.html
Expand 2 lanes to 4 lanes with turn lanes, bike accommodations and sidewalks
Project Details
- CSJ Number(s) or MTP Reference Numbers: 223001021
- Cost Estimate: $39,500,000
- Let Date: FY 2026
- Completion Date: 2028
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
FM 1560 expansion (from Galm/Shaenfield to FM 471)
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/013019.html
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Project Details
- CSJ Number(s) or MTP Reference Numbers: 223001020
- Cost Estimate: $21,000,000
- Let Date: FY 2026
- Completion Date: 2028
- Project Data last modified: February 8, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 151 expansion from SL 1604 to I 410
Project Type: Capacity ExpansionWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/052119.html
Expand From 4 Lane To 6 Lane Expressway on SH 151 from LP 1604 to IH 410 and include a 2 lane direct connector from WB SH 151 to NB LP 1604.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3508-01-029
- Cost Estimate: $97,800,000
- Let Date: FY 2023
- Completion Date: Unknown
- Project Data last modified: August 1, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 410 Operational Improvements (Ingram to NW Military)
Project Types: Study, Interchange/Intersection Improvements, Operation ImprovementsStudy to Identify and rank bottlenecks in Bexar County
Project Details
- CSJ Number(s):
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 26, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
VIA Bus ART
Project Type: Bus Rapid TransitVIA’s bus rapid transit has begun service along SL 345 between SL 1604 and downtown San Antonio and was modified to extend to Leon Valley which provides stops on Bandera Road.
Project Details
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 28, 2021
Regionally:
Operational Management
Incident Management System, access management, signalization and traffic flow improvements, railroad crossing improvements, construction coordination, and freight management.
Advanced Transportation Systems
Bus rapid transit, managed lanes, commuter rail service.
Transit
Public Transit Improvements for the region include transit service enhancements, transit facilities, and ridership incentives.
Travel Demand Management
Commute Solutions program aims to reduce automobile use and congestion through AAMPO’s rideshare program, work schedule coordination, telecommuting, walkable community program, and trip planning.
Pedestrian Improvements
The 2012 Bexar County/San Antonio MPO produced the Pedestrian Safety Action Plan which outlines network improvements needed to encourage walking in the current transportation system.
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Multimodal Transportation Center
Project Types: Study, Multimodal Transportation CenterWebsite: https://www.viainfo.net/link/
VIA launched its third Mobility on Demand (VIA Link) service in October 2021 to serve the Northwest Zone. This zone provides service to the northwest region along the northern Bandera Corridor from Mainland to just north of 1604. The Norwest VIA Link service also provides connections to UTSA Main Campus and Northwest Vista College. This service provides near door-to-door trips within the service boundary or, to get access outside the boundary, will drop passengers off at Mainland Transfer Point (at the Wal-Mart located near Bandera and Mainland), UTSA, or Northwest Vista College to transfer onto a fixed-route service. The Mainland location serves as a Mobility Hub providing a transfer point between fixed-route services and VIA Link, and a direct connection to the Leon Creek Greenway Trail System. Those fixed-route services include bus routes 88, 606, and 609. The hub is currently within a cul-de-sac with large on-street shelter and space for vehicle layover. The study will identify Three future Mobility Hub Locations to Facilitate Transfer Between VIA's Mobility On Demand (MOD) and Bus Networks. The existing Bandera Mainland Transfer Point will be study as one of the mobility hubs.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0915-12-728
- Study Cost: $445,000
- Let Date: FY 2025
- Completion Date: Unknown
- Project Data last modified: July 27, 2023
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled