Annual Hours of Delay/Mile: 311,896 Annual Congestion Cost: $62,239,726 County: Harris Previous Rankings: 24
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 69 PEL Study: SS 527 to SL 8 S
Project Types: Study, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/TollIH 69 Planning and Environmental Linkage Study: SS 527 to SL 8 S
Project Details
- MTP Reference Numbers: 0027-13-218
- Study Cost: $2,500,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 69/IH 610 Direct Connectors
Project Types: Interchange/Intersection Improvements, Operation ImprovementsFive direct connectors at IH 69 and IH 610
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-17-145,146,157,161, 0027-13-210,211
- Cost Estimate: $258,800,000
- Let Date: FY 2017
- Completion Date: 2024
- Project Data last modified: October 30, 2023
IH 69 Southwest Freeway Expansion from SS 527 to SL 8
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Operation ImprovementsReconstruct and widen from 8 to 10 main lanes on IH 69 from SS 527 to SL 8.
Project Details
- MTP Reference Numbers: 0027-13-236
- Cost Estimate: $1,000,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 Express Lanes
Project Type: Capacity ExpansionConstruct four express lanes on IH 610 from IH 69 to IH 10 West. The project is currently in the beginning phase of schematic and environmental development. There are no funds for construction at this time.
Project Details
- MTP Reference Numbers: 0271-17-162
- Cost Estimate: $321,317,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled