Annual Hours of Delay/Mile: 136,481 Annual Congestion Cost: $25,803,593 County: Harris Previous Rankings: 119
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3C-1 and 3C-2
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3C-1 and 3C-2: IH-10 at IH-69 Interchange: Reconstruct interchange to add IH-10 non-toll managed lanes and realign IH-45. IH-10: IH-69 to IH-45 North Freeway: Reconstruct to add IH-10 non-toll managed lanes for traffic bypassing Downtown. Access to local streets from IH-10 would be maintained via reconstructed general purpose lanes. Reconstruct the IH-10 interchange with IH-45. IH-10 at IH-45 Interchange: Reconstruction interchange to add IH-10 non-toll managed lanes and realign IH-45.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-599, 0500-08-001
- Cost Estimate: $2,724,000,000
- Let Date: FY 2027
- Completion Date: 2033
- Project Data last modified: October 30, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 2A
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsNHHIP Segment 2A IH-45: IH-610 to IH-10: Reconstruct IH-45 general purpose lanes from north of IH-610 to north of IH-10. Reconstruct and expand existing reversible single lane high-occupancy vehicle facility to be four lanes (two in each direction) for high-occupancy and transit vehicles.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-560
- Cost Estimate: $489,100,000
- Let Date: FY 2031
- Completion Date: 2035
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 1-B, 1-C and 1-D
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsNHHIP Segment 1-B, 1-C and 1-D: Reconstruct existing IH-45 eight general purpose lanes (4 in each direction). Reconstruct and widen existing reversible single lane high-occupancy vehicle facility to be four lanes (2 in each direction) for high-occupancy and transit vehicles. Reconstruct and widen existing four frontage road lanes (2 in each direction) to be six lanes (3 in each direction). Reconstruct two direct connectors at IH-45 and Beltway 8 Interchange.
Project Details
- MTP Reference Numbers: 0500-03-446, 0110-06-132, 0110-06-139
- Cost Estimate: $1,306,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Hardy Toll Road Downtown Connector
Project Types: Capacity Expansion, Managed Lanes/TollThe Hardy Downtown Connector project will extend the Hardy Toll Road from its current terminus at IH 610 North into downtown Houston and will consist of four toll lanes (two in each direction) for 3.6 miles. HCTRA recently reached the necessary agreements for the relocation of the rail line, an important milestone for the progression of this project, which will be completed in two phases. Phase I will include the relocation of the Houston Belt and; Terminal rail lines (completed in the fall of 2014), followed by the construction of overpasses at Quitman and Collingsworth, and an underpass at Lorraine Street to eliminate at-grade crossings. Phase II will be the construction of the toll lanes.
Project Details
- MTP Reference Numbers: 0912-72-608
- Cost Estimate: $250,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 2B
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsNHHIP Segment 2B: IH-45/IH-610 Interchange: Reconstruct the fully directional interchange at IH-45 and IH-610 and add new IH-45 and IH-610 frontage roads through the interchange. IH 45N: IH 10 to Airline Dr: Reconstruction IH-45 general purpose lanes from IH-10 to Airline Dr. Reconstruct and expand existing reversible single lane high occupancy vehicle facility to be four lanes (two in each direction) for high-occupancy and transit vehicles.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-596, 0500-03-597
- Cost Estimate: $1,282,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3D
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3D: IH-69: IH-45 Gulf Freeway to Buffalo Bayou: Depress and widen IH-69 from IH-45 Gulf Freeway to south of Buffalo Bayou. Reconstruct IH-69 interchanges with IH-45 Gulf Freeway. IH-45 Pierce Elevated: Re-align IH-45 from its current location on the west side of Downtown to be parallel with IH-69. Construct connectors on the west side of downtown providing access between the highway and local streets.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-598, 0500-03-601
- Cost Estimate: $1,578,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023