Annual Hours of Delay/Mile: 1,313,579 Annual Congestion Cost: $113,492,224 County: Harris Previous Rankings: 1
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 Dedicated Bus Lane
Project Types: Bus Only Lanes, Express Bus ServiceConstruct a dedicated bus lane on IH 610 from IH 10 West to Post Oak Boulevard at the Northwest Transit Center.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-17-163
- Cost Estimate: $57,200,000
- Let Date: FY 2018
- Completion Date: 2021
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 69/IH 610 Direct Connectors
Project Types: Interchange/Intersection Improvements, Operation ImprovementsFive direct connectors at IH 69 and IH 610
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-17-145,146,157,161, 0027-13-210,211
- Cost Estimate: $258,800,000
- Let Date: FY 2017
- Completion Date: 2024
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Downtown Redesign Study
Project Types: Study, Capacity Expansion, Integrated Corridor Management, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation Improvements, Other System ModificationRider 42 suggests $5,000,000 to conduct a downtown redesign study to examine corridor travel patterns within the IH 610 loop.
Project Details
- CSJ Number(s): 0912-00-479
- Study Cost: $5,000,000
- Let Date: Unknown
- Completion Date: 2018
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 Express Lanes
Project Type: Capacity ExpansionConstruct four express lanes on IH 610 from IH 69 to IH 10 West. The project is currently in the beginning phase of schematic and environmental development. There are no funds for construction at this time.
Project Details
- MTP Reference Numbers: 0271-17-162
- Cost Estimate: $321,317,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: July 31, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 from Voss to Studemont (Inner Katy)
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsOn IH 10 from Voss to Studemont, reconstruct 10 mainlanes and two 3-lane frontage roads and construct 4 new non-tolled managed lanes.
Project Details
- MTP Reference Numbers: 0271-07-343,342,344 & 346
- Cost Estimate: $1,164,800,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 Inner Katy Bus Rapid Transit
Project Type: Bus Rapid TransitConstruct multi-modal Bus Rapid Transit (BRT) busway including grade separation and connection to HOV lanes and transit center (METRO)
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-336
- Cost Estimate: $141,606,000
- Let Date: FY 2027
- Completion Date: 2031
- Project Data last modified: July 31, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 Inner Katy Bus Rapid Transit
Project Type: Bus Rapid TransitConstruct multi-modal Bus Rapid Transit (BRT) busway including grade separation and connection to HOV lanes and transit center (METRO)
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-336
- Cost Estimate: $141,606,000
- Let Date: FY 2027
- Completion Date: 2031
- Project Data last modified: July 31, 2023
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled