Annual Hours of Delay/Mile: 246,822 Annual Congestion Cost: $49,834,391 County: Harris Previous Rankings: 25
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 45 Widening: Kurland to FM 2351
Project Type: Capacity ExpansionWiden IH 45 from Kurland to FM 2351.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-462,550,565
- Cost Estimate: $77,500,000
- Let Date: FY 2011
- Completion Date: 2022
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 45/IH 610 Direct Connectors
Project Types: Interchange/Intersection Improvements, Operation ImprovementsConstruct direct connectors on IH 45 at IH 610.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-606,607
- Cost Estimate: $670,000,000
- Let Date: FY 2016
- Completion Date: 2023
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 45/SP 5 Direct Connectors
Project Types: Interchange/Intersection Improvements, Operation ImprovementsConstruct direct connectors on IH 45 at SP 5.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-605
- Cost Estimate: $30,450,000
- Let Date: FY 2017
- Completion Date: 2022
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 45 South PEL: BW 8 South to IH 69
Project Types: Study, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsIH 45 South PEL Study: BW 8 South to IH 69
Project Details
- MTP Reference Numbers: 0500-03-633
- Study Cost: $4,500,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 35 (Segment A) from Griggs Rd to IH 45/Spur 5
Project Types: Capacity Expansion, Operation ImprovementsConstruct 8-lane freeway on new location (Segment A)
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0178-09-018
- Cost Estimate: $93,900,000
- Let Date: FY 2023
- Completion Date: 2026
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610/SH 35 Interchange South
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection ImprovementsConstruct IH 610/SH 35 interchange (South DCs)
Project Details
- MTP Reference Numbers: 0271-16-152
- Cost Estimate: $168,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 S from IH 45 to SH 35 (SS 5/Mykawa)
Project Types: Capacity Expansion, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsIH 610 S from IH 45 to SH 35 (SS 5/Mykawa) - reconstruct freeway including TSM improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-16-158
- Cost Estimate: $102,400,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 35 New Location: From Bellfort to Harris C/L and SL 8 Interchange
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection ImprovementsConstruct new location roadway (6 main lanes and two 2-lane frontage roads) SH 35 from Bellfort to Harris C/L and construction SH 35/SL 8 interchange.
Project Details
- MTP Reference Numbers: 0178-09-016, 023, 024
- Cost Estimate: $361,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 35 (Segment C) Mainlanes from Dixie to N of Griggs Rd and IH 610/SH 35 Interchange North
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection ImprovementsConstruct IH 610/SH 35 interchange (North DCs) and construct SH 35 8-lane freeway on new location from Dixie to N of Griggs Rd
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-16-111, 0178-09-020
- Cost Estimate: $311,500,000
- Let Date: FY 2026
- Completion Date: 2030
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 35 (Segment B) from Dixie Drive to Long Drive (Frontage Roads)
Project Types: Capacity Expansion, Grade SeparationConstruct 2-lane frontage roads on new location (Segment B)
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0178-09-019
- Cost Estimate: $32,200,000
- Let Date: FY 2026
- Completion Date: 2029
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3D
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3D: IH-69: IH-45 Gulf Freeway to Buffalo Bayou: Depress and widen IH-69 from IH-45 Gulf Freeway to south of Buffalo Bayou. Reconstruct IH-69 interchanges with IH-45 Gulf Freeway. IH-45 Pierce Elevated: Re-align IH-45 from its current location on the west side of Downtown to be parallel with IH-69. Construct connectors on the west side of downtown providing access between the highway and local streets.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-598, 0500-03-601
- Cost Estimate: $1,578,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
North Houston Highway Improvement Project Segment 3C-1 and 3C-2
Project Types: Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation Improvements, Other System ModificationNHHIP Segment 3C-1 and 3C-2: IH-10 at IH-69 Interchange: Reconstruct interchange to add IH-10 non-toll managed lanes and realign IH-45. IH-10: IH-69 to IH-45 North Freeway: Reconstruct to add IH-10 non-toll managed lanes for traffic bypassing Downtown. Access to local streets from IH-10 would be maintained via reconstructed general purpose lanes. Reconstruct the IH-10 interchange with IH-45. IH-10 at IH-45 Interchange: Reconstruction interchange to add IH-10 non-toll managed lanes and realign IH-45.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0500-03-599, 0500-08-001
- Cost Estimate: $2,724,000,000
- Let Date: FY 2027
- Completion Date: 2033
- Project Data last modified: October 30, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled