Annual Hours of Delay/Mile: 169,864 Annual Congestion Cost: $16,252,966 County: Bexar Previous Rankings: 43
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 35 NEX South Phase 1
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/081519.html
I-35 NEX South South Phase 1 extends from I-410 south interchange to the I-410 North interchange. The scope of Phase 1 includes 3 new express lanes in each direction (2 GP + 1 HOV/Special Use Lane) and direct connectors at I-410S. The project will be delivered as a design build. 0017-10-168: I-410 South to I-410 North
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0017-10-168
- Cost Estimate: $700,000,000
- Let Date: FY 2023
- Completion Date: 2029
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35/IH 410 Expansion
Project Types: Capacity Expansion, Operation ImprovementsWebsite: http://my35.org/alamo/projects/sammc.htm
A project within these boundaries is currently underway to expand from 6- to 8-lane expressway between 410 North to 410 South; this project will reconfigure ramps, specifically converting the southbound IH 35 to a southbound IH 410 Ramp from a left side exit to a right side exit.
Project Details
- CSJ Number(s): 001710261
- Cost Estimate: $35,900,000
- Let Date: FY 2013
- Completion Date: 2019
- Project Data last modified: February 1, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 35 NEX (Central)
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/division/debt/strategic-projects/alternative-delivery/i35-nex.html
The I-35 NEX project will be phased into three segments: North, Central, and South. The I-35 NEX Central includes limits from IH 410 N to FM 3009. This is a clear initiative project with scope to expand the existing expressway to add 6 additional lanes (4 General Purpose and 2 HOV/Special Purpose). Project will also include direct connectors at IH 410 N and LP 1604 as well as work for ramps, frontage, and bridge from Cibolo Creek to FM 3009. I 35 NEX Central will be delivered as a design build project. 0016-06-047: BEXAR/GUADALUPE COUNTY LINE to FM 3009 0016-07-113: IH 410 N to GUADALUPE/BEXAR COUNTY LINE
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0016-06-047
- Cost Estimate: $278,800,000
- Let Date: FY 2021
- Completion Date: 2027
- Project Data last modified: February 8, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 0016-07-113
- Cost Estimate: $1,343,200,000
- Let Date: FY 2021
- Completion Date: 2027
- Project Data last modified: February 8, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 35 NEX South Phase 3
Project Types: Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/projects/hearings-meetings/san-antonio/archive/081519.html
I-35 NEX South Phase 3 extends form I-35 to I-410 just of FM 78. Phase 3 includes operational improvements and replace FM 78/SPRR/Binz Engelman Bridge.
Project Details
- CSJ Number(s): 0521-06-155
- Cost Estimate: $93,000,000
- Let Date: FY 2024
- Completion Date: 2028
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 46 Improvements (Bentwood Dr to FM 3159)
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh46-bulverde.html
Expand from 2 lanes to 6 lanes with raised median or center turn lane.
Project Details
- MTP Reference Numbers: 0215-01-051
- Cost Estimate: $51,900,000
- Let Date: FY 2033
- Completion Date: Unknown
- Project Data last modified: August 2, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 46 Improvements (Bulverde Road to Farhills)
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh46-bulverde.html
Expand from 2 lanes to 6 lanes with raised median or center turn lane.
Project Details
- MTP Reference Numbers: 0215-07-049
- Cost Estimate: $530,000,000
- Let Date: FY 2033
- Completion Date: Unknown
- Project Data last modified: August 2, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 35 NEX South Phase 1
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/081519.html
I-35 NEX South South Phase 1 extends from I-410 south interchange to the I-410 North interchange. The scope of Phase 1 includes 3 new express lanes in each direction (2 GP + 1 HOV/Special Use Lane) and direct connectors at I-410S. The project will be delivered as a design build. 0017-10-168: I-410 South to I-410 North
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0017-10-168
- Cost Estimate: $700,000,000
- Let Date: FY 2023
- Completion Date: 2029
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 46 Improvements (Farhills to Bentwood)
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/sh46-bulverde.html
Expanding from 2 lanes to 6 lanes with raised median or center turn lane. 0215-07-027: Farhills Dr. to US 281 0215-01-044: US 281 to Bentwood
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0215-01-044
- Cost Estimate: $31,900,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: August 2, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 0215-07-027
- Cost Estimate: $27,600,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: August 2, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 10 East from I 410 to SL 1604
Project Type: Capacity ExpansionDesign-Bid-Build I-10 East (From I-410 to Loop 1604) improvements consist of reconstructing and expanding the main lanes from 4 lanes to 6 lanes, and also consist of reconstructing and converting the frontage roads to one-way, as well as ramp and intersection reconfiguration for safer and more efficient operation.
Project Details
- CSJ Number(s): 002502160
- Cost Estimate: $109,000,000
- Let Date: FY 2018
- Completion Date: 2021
- Project Data last modified: July 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 410 @ IH 10 East Interchange Improvements
Project Type: Interchange/Intersection ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/i-410-at-i-10e.html
I-10 East at I-410 interchange improvements would consist of priority interchange improvements and would likely be constructed in phases.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 052106138
- Cost Estimate: $100,200,000
- Let Date: FY 2021
- Completion Date: 2023
- Project Data last modified: August 2, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 052106142
- Cost Estimate: $960,000,000
- Let Date: FY 2033
- Completion Date: Unknown
- Project Data last modified: August 2, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 1604 Expansion (I 35 to FM 78)
Project Type: Capacity ExpansionWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/102418.html
Design-Bid-Build Expand existing 4-lane divided roadway to a 4-lane expressway with frontage roads, intersection, and operational improvements.
Project Details
- CSJ Number(s): 245203112
- Cost Estimate: $55,000,000
- Let Date: FY 2018
- Completion Date: 2022
- Project Data last modified: April 29, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 35 Downtown Study
Project Types: Study, Capacity Expansion, Operation ImprovementsThe study will identify needed added capacity, operational or other improvements on the IH 10, IH 35, IH 37, US 90 and US 281 corridors in downtown San Antonio to address congestion. Earlier PEL studies recommended making improvements to potential alternative/parallel routes to this segment of I-35 due to the complexity and potentially controversial nature of rebuilding and expanding the current facility. The IH 35 downtown study would build upon the earlier PEL studies and carry feasibility study recommendations forward through schematic and environmental clearance.
Project Details
- MTP Reference Numbers: 091512688
- Study Cost: $16,800,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 8, 2023
Regionally:
Highway Emergency Response Operations (HERO)
Provide emergency response service along I 35, US 281, I 10 , I 37, LP 410. Provide assistance to disabled vehicles and crashes.
Project Details
- CSJ Number(s): 0915-00-212
- Cost Estimate: $2,500,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 2
- CSJ Number(s): 0915-00-213
- Cost Estimate: $5,500,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 3
- CSJ Number(s): 0915-00-214
- Cost Estimate: $5,500,000
- Let Date: FY 2021
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 4
- CSJ Number(s): 0915-00-227
- Cost Estimate: $5,500,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Operational Management
Incident Management System, access management, signalization and traffic flow improvements, railroad crossing improvements, construction coordination, and freight management.
Advanced Transportation Systems
Bus rapid transit, managed lanes, commuter rail service.
Transit
Public Transit Improvements for the region include transit service enhancements, transit facilities, and ridership incentives.
Travel Demand Management
Commute Solutions program aims to reduce automobile use and congestion through AAMPO’s rideshare program, work schedule coordination, telecommuting, walkable community program, and trip planning.
Pedestrian Improvements
The 2012 Bexar County/San Antonio MPO produced the Pedestrian Safety Action Plan which outlines network improvements needed to encourage walking in the current transportation system.
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
VIA Northeast Passenger Facility
Project Types: Study, Bicycle/Pedestrian Improvements, Local Bus Service, Multimodal Transportation Center, Park-and-RideIn June of 2014 the Transportation Commission dedicated funding to VIA to improve transit access along the congested IH 35 corridor. VIA has identified a comprehensive set of improvements that will improve multi-modal options and solutions. They are currently studying five locations for a new Northeast Passenger Facility. They will also be improving their bus stop accommodations by adding sidewalks, and other amenities to improve access, safety and comfort to transit riders. They are updating their transit fleet in the IH 35 corridor to improve safety and providing updates to their existing Randolph Park and Ride Facility.
Project Details
- MTP Reference Numbers:
- Let Date: FY 2014
- Completion Date: Unknown
- Project Data last modified: April 28, 2021
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled