Annual Hours of Delay/Mile: 240,102 Annual Congestion Cost: $37,430,850 County: Bexar Previous Rankings: 102
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 410 at US 90
Project Types: Interchange/Intersection Improvements, Operation ImprovementsDesign-Bid-Build improvements include the construction of two priority direct connectors; (1) Inbound US 90 to Northbound I-410, and (2) Southbound I-410 to Outbound US 90. The improvements also include the addition of an auxiliary lane along I-410 between US 90 and SH 151 and ramp reconfigurations for more efficient operation. Frontage road and intersection improvements are also within the scope of this project.
Project Details
- CSJ Number(s): 0521-05-118
- Cost Estimate: $75,100,000
- Let Date: FY 2016
- Completion Date: 2020
- Project Data last modified: February 1, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 410 Operational Improvements (Ingram to NW Military)
Project Types: Study, Interchange/Intersection Improvements, Operation ImprovementsStudy to Identify and rank bottlenecks in Bexar County
Project Details
- CSJ Number(s):
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 26, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I 410/Ingram to US 90 with Interchange at SH 151
Project Types: Capacity Expansion, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/030519.html
The proposed improvements will include an additional main-lane along I 410 between US 90 and Ingram Rd and ramp reconfiguration for more efficient operation. Improvements will also include 2 priority direct connectors at SH 151 (eastbound SH 151 to southbound I 410 and northbound I 410 to westbound SH 151). (Design-Bid-Build)
Project Details
- CSJ Number(s) or MTP Reference Numbers: 052104204
- Cost Estimate: $77,000,000
- Let Date: FY 2019
- Completion Date: 2022
- Project Data last modified: November 28, 2022
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 052104274
- Cost Estimate: $82,000,000
- Let Date: FY 2015
- Completion Date: 2017
- Project Data last modified: November 28, 2022
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bandera Road Operational Improvements
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.txdot.gov/projects/projects-studies/san-antonio/sh16-bandera-road-i410-loop1604.html
Operational Improvements between I 410 and Guilbeau Road and Guilbeau Road to LP 1604
Project Details
- CSJ Number(s) or MTP Reference Numbers: 029110100
- Cost Estimate: $65,000,000
- Let Date: FY 2044
- Completion Date: Unknown
- Project Data last modified: November 6, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 029110099
- Cost Estimate: $35,000,000
- Let Date: FY 2044
- Completion Date: Unknown
- Project Data last modified: November 6, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 151 expansion from SL 1604 to I 410
Project Type: Capacity ExpansionWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/san-antonio/052119.html
Expand From 4 Lane To 6 Lane Expressway on SH 151 from LP 1604 to IH 410 and include a 2 lane direct connector from WB SH 151 to NB LP 1604.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3508-01-029
- Cost Estimate: $97,800,000
- Let Date: FY 2023
- Completion Date: Unknown
- Project Data last modified: August 1, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 410 @ IH 10 East Interchange Improvements
Project Type: Interchange/Intersection ImprovementsWebsite: https://www.txdot.gov/inside-txdot/projects/studies/san-antonio/i-410-at-i-10e.html
I-10 East at I-410 interchange improvements would consist of priority interchange improvements and would likely be constructed in phases.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 052106138
- Cost Estimate: $100,200,000
- Let Date: FY 2021
- Completion Date: 2023
- Project Data last modified: August 2, 2023
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 052106142
- Cost Estimate: $960,000,000
- Let Date: FY 2033
- Completion Date: Unknown
- Project Data last modified: August 2, 2023
Regionally:
VIA Frequency Program CMAQ
Provide improved bus frequency along US 281 (Route 7) and I 410 (Route 552) ; increased frequency has a direct link to increase ridership which could reduce VMT or at least hold it steady and population increase.
Project Details
- CSJ Number(s): 091512673
- Cost Estimate: $7,037,144
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 5, 2020
Phase 2
- CSJ Number(s): 091512680
- Cost Estimate: $2,181,429
- Let Date: FY 2021
- Completion Date: Unknown
- Project Data last modified: February 5, 2020
Phase 3
- CSJ Number(s): 091512686
- Cost Estimate: $2,181,427
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: February 5, 2020
Highway Emergency Response Operations (HERO)
Provide emergency response service along I 35, US 281, I 10 , I 37, LP 410. Provide assistance to disabled vehicles and crashes.
Project Details
- CSJ Number(s): 0915-00-212
- Cost Estimate: $2,500,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 2
- CSJ Number(s): 0915-00-213
- Cost Estimate: $5,500,000
- Let Date: FY 2020
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 3
- CSJ Number(s): 0915-00-214
- Cost Estimate: $5,500,000
- Let Date: FY 2021
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Phase 4
- CSJ Number(s): 0915-00-227
- Cost Estimate: $5,500,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: February 4, 2020
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled