Annual Hours of Delay/Mile: 176,451 Annual Congestion Cost: $30,330,940 County: Travis Previous Rankings: 175
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 Capital Express North Project
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://my35capex.com/
Construct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-10-062, 0015-13-389
- Cost Estimate: $573,748,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 Capital Express Central Project
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://my35capex.com/
Construct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-14-428, 0015-13-433, 0015-13-423, 0015-13-442
- Cost Estimate: $3,258,050,000
- Let Date: FY 2025
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Cost Estimate: $2,000,000,000
- Let Date: FY 2026
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from Rundberg Lane to US 290E
Project Types: Bicycle/Pedestrian Improvements, Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: http://www.my35.org/capital-project-rundberg-us290e.htm
Construct 3 new direct connectors at I-35 and US 183, improve existing NB to NB direct connector, and make other operational improvements.
Project Details
- CSJ Number(s): 0015-13-382, 0015-13-387
- Cost Estimate: $124,000,000
- Let Date: FY 2017
- Completion Date: 2022
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 at Parmer Lane
Project Types: Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: https://my35construction.org/projects/parmer-lane
Construct diverging diamond intersection, widen and extend northbound frontage road, add southbound intersection bypass lane, and reconstruct the northbound intersection bypass lane.
Project Details
- CSJ Number(s): 0015-13-396
- Cost Estimate: $25,000,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 29, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 Ramp Closure
Project Types: Capacity Expansion, Operation ImprovementsOverlay and restripe to add northbound and southbound auxiliary lane from Metric Blvd to IH 35. Incidental work at US 183 NBFR/Lamar Intersection.
Project Details
- CSJ Number(s): 0151-06-149
- Cost Estimate: $4,000,000
- Let Date: FY 2020
- Completion Date: 2021
- Project Data last modified: November 15, 2021
Highway Emergency Response Operator (HERO) Patrol Service
Project Type: Incident ManagementThe Highway Emergency Response Operator (HERO) Patrol Service, operated by CTRMA in partnership with TxDOT and the Texas A&M Transportation Institute, will provide incident management service along IH 35 traffic from Round Rock to Buda.
IH 35 Integrated Corridor Management
Project Type: Integrated Corridor ManagementTxDOT, the City of Austin, and other local partner agencies have worked since 2015 on implementing Integrated Corridor Management (ICM) strategies. ICM includes expanding the use of real-time travel information in highly congested urban areas to enable agencies and third party routing applications to better inform the public about travel options. It also enables agencies to make responsive adjustments to their respective systems as appropriate, for example, adjusting transit routes or traffic signals. The effort is intended to facilitate interagency collaboration and help combine numerous information technologies and real-time travel information from highway, rail, and transit operations.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SL 1 Barton Skyway to SL 360
Project Types: Access Management, Interchange/Intersection Improvements, Operation ImprovementsExtend Southbound auxiliary lane and reconstruct 4 southbound ramps
Project Details
- CSJ Number(s) or MTP Reference Numbers: 313601193
- Cost Estimate: $6,903,000
- Let Date: FY 2023
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
MoPac South Environmental Study
Project Type: Managed Lanes/TollWebsite: HTTP://WWW.MOPACSOUTH.COM
Reconstruct Loop 1 from FM 734 to Cesar Chavez (Phase 1) and from Cesar Chavez to Slaughter Lane (Phase 2) adding managed lanes in each direction. Transit buses and registered vanpools will be able to use the managed lanes without a toll while carpools and single occupant vehicles will pay a toll.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3136-01-107
- Cost Estimate: $171,000,000
- Let Date: FY 2012
- Completion Date: 2017
- Project Data last modified: November 29, 2022
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 3136-01-176
- Cost Estimate: $825,000,000
- Let Date: FY 2024
- Completion Date: 2027
- Project Data last modified: November 29, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 130 – Segment 2
Project Type: Capacity ExpansionAdd a third lane in each direction from SH 45 N to US 290.
Project Details
- CSJ Number(s): 0440-06-017
- Cost Estimate: $37,000,000
- Let Date: FY 2018
- Completion Date: 2021
- Project Data last modified: November 11, 2021
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
City of Austin Corridor Mobility Program – North Lamar
Project Types: Bicycle/Pedestrian Improvements, Operation Improvements, Signal Operations/ManagementWebsite: https://data.austintexas.gov/stories/s/Corridor-Mobility-Program/gukj-e8fh/
Proposed raised median with a rehab sidewalk and dedicated or Shared Use Path Bike Lane along North Lamar from US 183 to Howard Lane.
Project Details
- CSJ Number(s): 0011-11-067, 0011-11-068
- Cost Estimate: $13,552,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: November 11, 2020
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 183 South
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsWebsite: https://www.183south.com/
Reconstruct US 183 (Bergstrom Expressway) from US 290 to SH 71 as a 6-lane toll facility while improving turning movements, travel patterns, and capacity. The environmental study began in 2011 and was cleared in 2015. Phase 1 from TechniCenter to US 290E opened to the public in 2019. Phase 2 from TechniCenter to SH 71 is projected to be open to the public in 2021.
Project Details
- MTP Reference Numbers: 0151-09-036
- Cost Estimate: $743,000,000
- Let Date: FY 2015
- Completion Date: 2021
- Project Data last modified: February 14, 2024
Regionally:
Regional Travel Options
The Commute Solutions program will promote the use of teleworking, flexible schedules, carpooling, vanpooling, public transit, walking, biking, and reducing barriers to alternative commuting. All routine passenger travel with an origin or destination within the six counties of the CAMPO MPA is considered within the scope of this project. This project consists of six tasks: 1) regional program coordination and outreach; 2) commuter education and enrollment campaigns; 3) ride-sharing/trip-planning tools; 4) regional commuting surveys; 5) grants and training to support local and sub-regional TOM activities, and 6) applied research into innovative regional TOM strategies and performance measurement.
Project Details
- CSJ Number(s): 0914-00-423
- Cost Estimate: $312,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 12, 2019
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Project Connect
Project Types: Access Management, Bus Rapid Transit, Commuter/Light Rail, Express Bus Service, Local Bus Service, Multimodal Transportation Center, Operation Improvements, Park-and-Ride, Travel OptionsWebsite: http://www.projectconnect.com/
Project Connect is a vision for Central Texas’ high-capacity transit system linking activity centers within the fastest growing region in the country and aims to connect people, places, and opportunities in an easy and efficient way.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled