Annual Hours of Delay/Mile: 417,822 Annual Congestion Cost: $63,324,543 County: Williamson Previous Rankings: 19
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from Rundberg Lane to US 290E
Project Types: Bicycle/Pedestrian Improvements, Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: http://www.my35.org/capital-project-rundberg-us290e.htm
Construct 3 new direct connectors at I-35 and US 183, improve existing NB to NB direct connector, and make other operational improvements.
Project Details
- CSJ Number(s): 0015-13-382, 0015-13-387
- Cost Estimate: $124,000,000
- Let Date: FY 2017
- Completion Date: 2022
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from RM 1431 to SH 45N
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsConstruct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, direct connectors at SH 45N, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-09-178
- Cost Estimate: $336,310,000
- Let Date: FY 2029
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Highway Emergency Response Operator (HERO) Patrol Service
Project Type: Incident ManagementThe Highway Emergency Response Operator (HERO) Patrol Service, operated by CTRMA in partnership with TxDOT and the Texas A&M Transportation Institute, will provide incident management service along IH 35 traffic from Round Rock to Buda.
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from US 79 to SH 45N (Southbound)
Project Types: Interchange/Intersection Improvements, Operation Improvements, Signal Operations/ManagementWebsite: http://www.my35.org/capital-project-us79-sh45n-sb.htm
Addition of a southbound auxiliary lane
Project Details
- CSJ Number(s): 0015-09-194
- Cost Estimate: $9,323,000
- Let Date: FY 2021
- Completion Date: Unknown
- Project Data last modified: February 14, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 Capital Express North Project
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://my35capex.com/
Construct non-tolled managed lanes adding capacity in each direction, auxiliary lanes, ramp relocations and modifications, collector/distributor roads, innovative intersection designs, and bicycle/pedestrian improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0015-10-062, 0015-13-389
- Cost Estimate: $573,748,000
- Let Date: FY 2022
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35 from RM 1431 to FM 3406 (Northbound)
Project Type: Operation ImprovementsWebsite: http://www.my35.org/capital/projects/williamson/rm1431-fm3406-north.htm
Reconstruct/widen the IH 35 NB frontage road from two to three lanes between RM 1431 and FM 3406. Relocate the exit ramp to RM 1431 and extend the existing auxiliary lane, or extended entrance/exit lane.
Project Details
- CSJ Number(s): 0015-09-193
- Cost Estimate: $10,706,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 29, 2022
Parallel Corridors:
No improvements are currently planned.
Regionally:
Regional Travel Options
The Commute Solutions program will promote the use of teleworking, flexible schedules, carpooling, vanpooling, public transit, walking, biking, and reducing barriers to alternative commuting. All routine passenger travel with an origin or destination within the six counties of the CAMPO MPA is considered within the scope of this project. This project consists of six tasks: 1) regional program coordination and outreach; 2) commuter education and enrollment campaigns; 3) ride-sharing/trip-planning tools; 4) regional commuting surveys; 5) grants and training to support local and sub-regional TOM activities, and 6) applied research into innovative regional TOM strategies and performance measurement.
Project Details
- CSJ Number(s): 0914-00-423
- Cost Estimate: $312,000
- Let Date: FY 2019
- Completion Date: 2021
- Project Data last modified: November 12, 2019
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled