Annual Hours of Delay/Mile: 188,226 Annual Congestion Cost: $43,291,059 County: Tarrant Previous Rankings: 54
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 30 from IH 35W to Cooper Street
Project Types: Study, Access Management, Bicycle/Pedestrian Improvements, Capacity Expansion, Managed Lanes/Toll, Multimodal Transportation Center, Operation ImprovementsCorridor Improvement along IH 30 from IH 35W to Cooper Street to evaluate additional capacity and frontage road integration along the corridor. This will implement a express/managed lane system which is to be evaluated for commuter traffic or alternative traffic flow for autonomous vehicles or automated freight corridor.
Project Details
- MTP Reference Numbers: 28.30.3
- Study Cost: $9,000,000
- Estimated Project Cost: $975,000,000
- Let Date: FY 2033
- Completion Date: 2038
- Project Data last modified: May 1, 2024
Phase 2
- MTP Reference Numbers: 1068-02-072
- Let Date: FY 2037
- Completion Date: 2041
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 30 from Cooper Street to SH 161
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Intelligent Transportation Systems, Managed Lanes/Toll, Operation ImprovementsIH 30 from Cooper Street to SH 161 will add additional capacity and integrate frontage roads along the corridor. The is have operational improvements to the current managed lane system. TIP code 13000, 13001
Project Details
- CSJ Number(s) or MTP Reference Numbers: 1068-02-147
- Cost Estimate: $190,000,000
- Let Date: FY 2028
- Completion Date: 2031
- Project Data last modified: May 1, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 1068-04-170
- Cost Estimate: $18,800,000
- Let Date: FY 2028
- Completion Date: 2031
- Project Data last modified: May 1, 2024
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Southeast Connector
Project Types: Access Management, Capacity Expansion, Intelligent Transportation Systems, Operation ImprovementsProject Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 30/SH 360 Interchange
Project Types: Capacity Expansion, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.keep30360moving.org/
TxDOT is planning improvements for SH 360 between IH 30 at SH 360 including new main lanes, frontage roads, and direct connector ramps at the IH 30 interchange. The main lanes of SH 360 from IH 30 to Abram Street will be completely reconstructed as an 8-lane expressway, with allowances for possible future expansion to 10 lanes. SH 360 from Abram Street to IH 20 will be expanded to eight lanes using the existing median. Other improvements include the reconstruction of Division Street and the adjacent Union Pacific Railroad bridge.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 1068-02-076
- Cost Estimate: $231,258,000
- Let Date: FY 2016
- Completion Date: 2025
- Project Data last modified: May 1, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 1068-02-104
- Cost Estimate: $1,924,000
- Let Date: FY 2016
- Completion Date: 2025
- Project Data last modified: May 1, 2024
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled