Annual Hours of Delay/Mile: 176,224 Annual Congestion Cost: $42,160,390 County: Tarrant Previous Rankings: 79
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Southeast Connector
Project Types: Access Management, Capacity Expansion, Intelligent Transportation Systems, Operation ImprovementsProject Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 20 from Park Springs Blvd to Dallas County Line
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Intelligent Transportation Systems, Operation ImprovementsRECONSTRUCT FREEWAY FROM 8 TO 10 LANES AND 4/6 LANE CONTINUOUS FRONTAGE ROADS
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2374-05-084
- Cost Estimate: $363,670,000
- Let Date: FY 2035
- Completion Date: 2038
- Project Data last modified: May 1, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 2374-05-093
- Cost Estimate: $89,286,000
- Let Date: FY 2029
- Completion Date: 2032
- Project Data last modified: May 1, 2024
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 360 Lane Addition
Project Type: Capacity ExpansionRECONSTRUCT AND WIDEN FROM 8 TO 10 GENERAL PURPOSE LANES, 4/6 DISCONTINUOUS FRONTAGE ROAD LANES TO 4/8 CONTINUOUS FRONTAGE ROAD LANES; ADD SHARED-USE PATH AND SIDEWALKS.
Project Details
- CSJ Number(s): 2266-02-086
- Cost Estimate: $53,391,000
- Let Date: FY 2018
- Completion Date: 2023
- Project Data last modified: May 1, 2024
Phase 2
- CSJ Number(s): 2374-05-094
- Cost Estimate: $178,572,000
- Let Date: FY 2032
- Completion Date: 2035
- Project Data last modified: May 1, 2024
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled