Annual Hours of Delay/Mile: 214,949 Annual Congestion Cost: $61,957,883 County: Dallas Previous Rankings: 38
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Southern Gateway Project
Project Types: Capacity Expansion, Managed Lanes/TollWebsite: http://www.thesoutherngateway.org/
The Southern Gateway (TSG) will fully reconstruct and widen I-35E to include 5 general purpose lanes in each direction and 2 reversible non-tolled express lanes from Colorado Boulevard to US 67. The US 67 scope will save the existing paving and widen to provide a 3rd general purpose lane in each direction from I-35E to I-20. The existing concurrent US 67 HOV lane will be reconstructed to be 1 reversible non-tolled express lane in the center median.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0442-02-088, 0196-03-269, 0261-03-030
- Cost Estimate: $665,600,000
- Let Date: FY 2018
- Completion Date: 2022
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
I-20 Frontage Roads at US 67
Project Types: Access Management, Grade Separation, Incident Management, Interchange/Intersection Improvements, Operation ImprovementsConstruct new Eastbound and Westbound 4/6 lane frontage roads from Cockrell Hill to Hampton Road.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2374-04-085
- Cost Estimate: $80,000,000
- Let Date: FY 2022
- Completion Date: 2025
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 20 Feasibility Study (From SH 360 to US 67)
Project Types: Study, Access Management, Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Operation ImprovementsIdentify future general purpose lanes, frontage roads and interchange operational improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2374-04-081
- Study Cost: $2,700,000
- Estimated Project Cost: $250,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: May 1, 2024
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 20 from Park Springs Blvd to Dallas County Line
Project Types: Bicycle/Pedestrian Improvements, Capacity Expansion, Intelligent Transportation Systems, Operation ImprovementsRECONSTRUCT FREEWAY FROM 8 TO 10 LANES AND 4/6 LANE CONTINUOUS FRONTAGE ROADS
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2374-05-084
- Cost Estimate: $363,670,000
- Let Date: FY 2035
- Completion Date: 2038
- Project Data last modified: May 1, 2024
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 2374-05-093
- Cost Estimate: $89,286,000
- Let Date: FY 2029
- Completion Date: 2032
- Project Data last modified: May 1, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 360 Lane Addition
Project Type: Capacity ExpansionRECONSTRUCT AND WIDEN FROM 8 TO 10 GENERAL PURPOSE LANES, 4/6 DISCONTINUOUS FRONTAGE ROAD LANES TO 4/8 CONTINUOUS FRONTAGE ROAD LANES; ADD SHARED-USE PATH AND SIDEWALKS.
Project Details
- CSJ Number(s): 2266-02-086
- Cost Estimate: $53,391,000
- Let Date: FY 2018
- Completion Date: 2023
- Project Data last modified: May 1, 2024
Phase 2
- CSJ Number(s): 2374-05-094
- Cost Estimate: $178,572,000
- Let Date: FY 2032
- Completion Date: 2035
- Project Data last modified: May 1, 2024
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled