Annual Hours of Delay/Mile: 131,698 Annual Congestion Cost: $22,589,090 County: Tarrant Previous Rankings: 177
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Southeast Connector
Project Types: Access Management, Capacity Expansion, Intelligent Transportation Systems, Operation ImprovementsParallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Southeast Connector
Project Types: Access Management, Capacity Expansion, Intelligent Transportation Systems, Operation ImprovementsProject Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 35W: IH 20 to South of Altamesa
Reconstruct and widen 6 to 11 lanes with continuous 4/6 to 4/6 lane frontage roads and shared use path.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0014-16-285
- Cost Estimate: $90,229,000
- Let Date: FY 2036
- Completion Date: 2039
- Project Data last modified: May 1, 2024
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled