Annual Hours of Delay/Mile: 409,663 Annual Congestion Cost: $69,148,933 County: Harris Previous Rankings: 33
Projects
Corridor Specific:
No improvements are currently planned.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 from Voss Rd to IH 610 W (Inner Katy- Segment 4)
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsOn IH 10 from Voss Rd to IH 610 W (Inner Katy- Segment 4), reconstruct 10 mainlanes and two 3-lane frontage roads and construct 4 new non-tolled managed lanes.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-343
- Cost Estimate: $28,000,000
- Let Date: FY 2028
- Completion Date: 2031
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 from IH 610 W to Washington Ave (Inner Katy- Segment 3)
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsOn IH 10 from IH 610 W to Washington Ave (Inner Katy- Segment 3), reconstruct 10 mainlanes and two 3-lane frontage roads and construct 4 new non-tolled managed lanes.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-342
- Cost Estimate: $308,000,000
- Let Date: FY 2028
- Completion Date: 2032
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 from Washington Ave to E of Patterson St (Inner Katy- Segment 2)
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsOn IH 10 from Washington Ave to E of Patterson St (Inner Katy- Segment 2), reconstruct 10 mainlanes and two 3-lane frontage roads and construct 4 new non-tolled managed lanes and construct detention pond and pump station.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-344
- Cost Estimate: $520,800,000
- Let Date: FY 2028
- Completion Date: 2032
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 from Studemont to Houston Ave (White Oak Bayou Project)
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsThis roadway improvement will reconstruct IH-10 from Studemont Street to Houston Avenue to raise the profile of IH-10 out of the White Oak Bayou floodway.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-326
- Cost Estimate: $313,000,000
- Let Date: FY 2024
- Completion Date: 2028
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Hempstead Highway Widening; Railroad Grade Separation
Project Types: Capacity Expansion, Grade Separation, Interchange/Intersection Improvements, Operation ImprovementsHempstead Hwy from W of 12th St to E of of Washington\Katy Split- Widen roadway with a railroad bridge for $49.9 million.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 8170-12-001
- Cost Estimate: $49,900,000
- Let Date: FY 2017
- Completion Date: 2025
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Hempstead Highway Inside Beltway 8
Project Types: Capacity Expansion, Managed Lanes/Toll, Travel OptionsHempstead Inside Beltway 8: • Propose an expanded elevated structure to provide Hempstead Managed Lanes • Reconstructed Hempstead road at-grade with two-lanes each direction and one-lane each direction for transit
Project Details
- MTP Reference Numbers: 0912-72-598,599,601,603
- Cost Estimate: $1,008,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 from E of Patterson St to E of Studemont St (Inner Katy- Segment 1)
Project Types: Capacity Expansion, Managed Lanes/Toll, Operation ImprovementsOn IH 10 from E of Patterson St to E of Studemont St (Inner Katy- Segment 1), reconstruct 10 mainlanes and two 3-lane frontage roads and construct 4 new non-tolled managed lanes.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0271-07-346
- Cost Estimate: $308,000,000
- Let Date: FY 2028
- Completion Date: 2032
- Project Data last modified: October 30, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 610 Express Lanes
Project Type: Capacity ExpansionConstruct four express lanes on IH 610 from IH 69 to IH 10 West. The project is currently in the beginning phase of schematic and environmental development. There are no funds for construction at this time.
Project Details
- MTP Reference Numbers: 0271-17-162
- Cost Estimate: $321,317,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 30, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled