Annual Hours of Delay/Mile: 189,654 Annual Congestion Cost: $20,223,600 County: EL Paso Previous Rankings: 87
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 Segment 3
Project Types: Study, Bicycle/Pedestrian Improvements, Capacity Expansion, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.reimaginei10.com/
2121-02-168: I-10 Segment 3A (Copia to Paisano); Add 1 Lane each direction, add 1 adaptive/transit lane each direction, add cd lanes, frontage road improvements, ramp improvements, intersection improvements, and bike/ped amenities. 2121-03-159: I-10 SEG3B (Paisano to Airway); Add 1 lane each direction, add 1 adaptive lane each direction, add frontage roads each direction, ramp and operational improvements, and bike/PED amenities. 2121-03-162: I-10 SEG3C (AIRWAY TO YARBROUGH); Add 1 lane each direction, add 1 adaptive lane each direction, frontage road ramp improvements, intersection improvements, and bike/ped amenities. 2121-03-163: I-10 SEG3D1 (YARBROUGH TO FM659); Add 1 lane each direction, add 1 adaptive lane each direction, frontage road improvements, ramp and DC improvements, intersection improvements, and bike/ped amenities. 2121-04-119: I-10 SEG3D2 (FM659 TO EASTLAKE); Add 1 lane each direction, add 1 adaptive lane each direction, frontage road improvements, ramp and DC improvements, intersection improvements, and bike/ped amenities.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2121-02-166
- Estimated Project Cost: $503,410,932
- Let Date: FY 2026
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 2121-02-168
- Estimated Project Cost: $355,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 3
- CSJ Number(s) or MTP Reference Numbers: 2121-03-159
- Estimated Project Cost: $276,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 4
- CSJ Number(s) or MTP Reference Numbers: 2121-03-162
- Estimated Project Cost: $355,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 5
- CSJ Number(s) or MTP Reference Numbers: 2121-03-163
- Estimated Project Cost: $333,970,525
- Let Date: FY 2034
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 6
- CSJ Number(s) or MTP Reference Numbers: 2121-04-119
- Estimated Project Cost: $333,970,525
- Let Date: FY 2037
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 Segment 2
Project Types: Access Management, Bicycle/Pedestrian Improvements, Capacity Expansion, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://reimaginei10.com/downtown10.html
2121-02-166: I-10 Segment 2 Ph1 (Exec Ctr to SL 478/Copia St; Add 1 Lane each direction, add 1 adaptive/transit lane each direction, ramp and operational improvements, reconstruct and improve intersections, new frontage roads (2 Lanes each direction), and bike paths. Project phasing under consideration.
Project Details
- CSJ Number(s): 2121-02-166
- Cost Estimate: $588,000,000
- Let Date: FY 2027
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Reimagine I-10 Corridor Study
Project Type: StudyWebsite: http://www.ReimagineI10.com
I-10 Corridor Feasibility Study, New Mexico/Texas State Line to FM 3380
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2121-01-095
- Study Cost: $8,300,000
- Let Date: FY 2027
- Completion Date: Unknown
- Project Data last modified: February 14, 2022
Phase 2
- CSJ Number(s) or MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: February 14, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 Ramp Improvements from Airway to Viscount
Project Types: Incident Management, Integrated Corridor Management, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsI-10 Ramps Improvements WB From Airway to Viscount, Add auxiliary lanes and a braided ramp 0.3 miles east of Hawkins Boulevard.
Project Details
- CSJ Number(s) or MTP Reference Numbers: CSJ 2121-03-154 (MPO ID: I060X)
- Cost Estimate: $16,512,000
- Let Date: FY 2017
- Completion Date: Unknown
- Project Data last modified: February 14, 2022
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
US 62 Montana and US 85 (Paisano Drive) Corridor Study
Project Types: Study, Access Management, Bicycle/Pedestrian Improvements, Bus Only Lanes, Incident Management, Integrated Corridor Management, Intelligent Transportation Systems, Interchange/Intersection Improvements, Local Bus Service, Operation Improvements, Other System Modification, Signal Operations/Management, Travel OptionsWebsite: https://www.txdot.gov/projects/hearings-meetings/el-paso/paisano-montana-study-101723.html
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bus Rapid Transit: Montana Avenue
Project Types: Bus Rapid Transit, Express Bus Service, Intelligent Transportation Systems, Local Bus Service, Operation Improvements, Park-and-Ride, Signal Operations/ManagementConstruct the Montana (US 62/US 180) Rapid Transit System.
Project Details
- MTP Reference Numbers: 0374-02-089, T017D
- Cost Estimate: $12,779,000
- Let Date: FY 2019
- Completion Date: 2024
- Project Data last modified: April 29, 2024
Phase 2
- MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
LP 375 Widening from Bob Hope Dr to Zaragoza Rd
Project Types: Capacity Expansion, Operation ImprovementsWebsite: https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/el-paso/072518.html
Widen SL 375 (Americas/Joe Battle) from 4 to 6 lanes from Bob Hope Dr to Zaragoza Rd.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2552-03-049, F056X-CAP
- Cost Estimate: $30,032,000
- Let Date: FY 2020
- Completion Date: 2023
- Project Data last modified: April 27, 2021
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 2552-04-047
- Cost Estimate: $4,470,000
- Let Date: FY 2020
- Completion Date: 2025
- Project Data last modified: April 27, 2021
Regionally:
Transit
Regional public transit enhancements.
Travel Demand Management
Coordination of the regional carpool and vanpool programs.
Planned for Transit:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 10 Segment 3
Project Types: Study, Bicycle/Pedestrian Improvements, Capacity Expansion, Intelligent Transportation Systems, Interchange/Intersection Improvements, Operation ImprovementsWebsite: https://www.reimaginei10.com/
2121-02-168: I-10 Segment 3A (Copia to Paisano); Add 1 Lane each direction, add 1 adaptive/transit lane each direction, add cd lanes, frontage road improvements, ramp improvements, intersection improvements, and bike/ped amenities. 2121-03-159: I-10 SEG3B (Paisano to Airway); Add 1 lane each direction, add 1 adaptive lane each direction, add frontage roads each direction, ramp and operational improvements, and bike/PED amenities. 2121-03-162: I-10 SEG3C (AIRWAY TO YARBROUGH); Add 1 lane each direction, add 1 adaptive lane each direction, frontage road ramp improvements, intersection improvements, and bike/ped amenities. 2121-03-163: I-10 SEG3D1 (YARBROUGH TO FM659); Add 1 lane each direction, add 1 adaptive lane each direction, frontage road improvements, ramp and DC improvements, intersection improvements, and bike/ped amenities. 2121-04-119: I-10 SEG3D2 (FM659 TO EASTLAKE); Add 1 lane each direction, add 1 adaptive lane each direction, frontage road improvements, ramp and DC improvements, intersection improvements, and bike/ped amenities.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2121-02-166
- Estimated Project Cost: $503,410,932
- Let Date: FY 2026
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 2
- CSJ Number(s) or MTP Reference Numbers: 2121-02-168
- Estimated Project Cost: $355,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 3
- CSJ Number(s) or MTP Reference Numbers: 2121-03-159
- Estimated Project Cost: $276,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 4
- CSJ Number(s) or MTP Reference Numbers: 2121-03-162
- Estimated Project Cost: $355,500,000
- Let Date: FY 2032
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 5
- CSJ Number(s) or MTP Reference Numbers: 2121-03-163
- Estimated Project Cost: $333,970,525
- Let Date: FY 2034
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Phase 6
- CSJ Number(s) or MTP Reference Numbers: 2121-04-119
- Estimated Project Cost: $333,970,525
- Let Date: FY 2037
- Completion Date: Unknown
- Project Data last modified: November 28, 2022
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
Bus Rapid Transit: Montana Avenue
Project Types: Bus Rapid Transit, Express Bus Service, Intelligent Transportation Systems, Local Bus Service, Operation Improvements, Park-and-Ride, Signal Operations/ManagementConstruct the Montana (US 62/US 180) Rapid Transit System.
Project Details
- MTP Reference Numbers: 0374-02-089, T017D
- Cost Estimate: $12,779,000
- Let Date: FY 2019
- Completion Date: 2024
- Project Data last modified: April 29, 2024
Phase 2
- MTP Reference Numbers:
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: April 29, 2024
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled