Annual Hours of Delay/Mile: 425,895 Annual Congestion Cost: $77,583,640 County: Dallas Previous Rankings: 18
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
LBJ East
Project Types: Access Management, Bicycle/Pedestrian Improvements, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Interchange/Intersection Improvements, Managed Lanes/Toll, Operation ImprovementsWebsite: https://635east.com/
I-635 LBJ (East Section) will consist of full re-construction and widening of I-635 from US 75 to I-30, including the I-30 Interchange, approximately 11 miles. The general purpose lanes will be widened from 8 to 10 lanes and the existing Tolled Managed Lanes will remain as two lanes, for a total of 12 general purpose and Tolled Managed Lanes, in addition to construction of continuous frontage roads and numerous intersection improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 2374-01-137, 2374-01-183, 2374-02-053, 2374-02-152, 2374-01-190, 2374-01-191, 2374-02-153, 2374-01-171
- Cost Estimate: $1,800,000,000
- Let Date: FY 2019
- Completion Date: 2025
- Project Data last modified: May 1, 2024
Parallel Corridors:
No improvements are currently planned.
Regionally:
Regional Trip Reduction Program
This program includes funding for the vanpool program, bike/pedestrian improvements, and sustainable development initiatives.
ITS
Develop a regional data and video communication system to aid in the flow of regional ITS information to partners in the DFW region, including individual agency connections & hardware needs for the regional network.
Regional Mobility Assistance Patrol
Mobility assistance patrols that provide assistance to stranded motorists due to vehicle problems or non-injury accidents.
Operational Improvements
These include intersection improvements, ramp additions, auxiliary lanes, HOV extensions, and general ITS applications.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled