Annual Hours of Delay/Mile: 157,973 Annual Congestion Cost: $33,505,814 County: Harris Previous Rankings: 45
Projects
Corridor Specific:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
FM 1960 at Cutten Rd Intersection Improvements
Project Type: Interchange/Intersection ImprovementsFM 1960 at Cutten intersection improvements.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 1685-01-090
- Cost Estimate: $27,300,000
- Let Date: FY 2023
- Completion Date: 2026
- Project Data last modified: November 1, 2023
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 99: SH 249 to Holzwarth
Project Types: Capacity Expansion, Grade Separation, Managed Lanes/TollWiden from 4 to 6 lanes (toll) Segment F-2
Project Details
- CSJ Number(s) or MTP Reference Numbers: 3510-06-019, 3510-06-027
- Cost Estimate: $110,000,000
- Let Date: FY 2024
- Completion Date: 2030
- Project Data last modified: November 1, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
IH 45 N Study: SL 8 N to SL 336 S (PEL)
Project Types: Study, Capacity Expansion, Grade Separation, Intelligent Transportation Systems, Managed Lanes/Toll, Operation ImprovementsStudy ongoing to determine future improvements needed.
Project Details
- MTP Reference Numbers: 0912-00-536
- Study Cost: $3,000,000
- Let Date: Unknown
- Completion Date: Unknown
- Project Data last modified: October 31, 2023
Regionally:
Traffic Management Center (Houston)
Houston TranStar, a consortium of local governments in partnership with the state, is responsible for transportation operations and emergency management in the greater Houston area.
Pedestrian Improvements (Houston)
Strategically enhance bicycle and pedestrian infrastructure throughout the H-GAC region.
METRO Vanpool (Houston)
METRO supports the regional vanpool program which includes approximately 700 vans, 7,100 participants, 200,000 trips per month, 6,000,000 passenger miles per month, and 5,000,000 VMT reduction per month.
Regional Trip Reduction Program (Houston)
Regional TMO and Commute Solutions program support to promote alternative commute mode choices including carpool, vanpool, transit, telecommuting, and biking. Implement community-wide marketing and public relations campaigns to educate citizens on alternative commute mode choices.
Incident Management (Houston)
TxDOT along with other transportation and safety organizations within the Houston area co-sponsor Houston’s Motorist Assistance Program (MAP), an incident management program.
ITS (Houston)
Intelligent Transportation Systems: advanced traffic management, advanced public transit system, and emergency management.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled