Annual Hours of Delay/Mile: 61,011 Annual Congestion Cost: $8,320,719 County: Nueces Previous Rankings: 82
Projects
Corridor Specific:
No improvements are currently planned.
Parallel Corridors:
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 286 Freeway Extension
Project Types: Capacity Expansion, Grade SeparationSH 286 serves as a parallel route to South Staples St. The proposed SH 286 project includes capacity improvements/upgrade of existing 2-lane highway to 4-lane freeway from FM 43 (Weber Rd.) to FM 2444 (Staples St.) which will provide commuters with an alternate route to and from the Southside of Corpus Christi.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 0326-01-056
- Cost Estimate: $50,000,000
- Let Date: FY 2024
- Completion Date: 2028
- Project Data last modified: February 9, 2023
Project Status
Feasibility Study:
Preliminary Design:
NEPA Review:
Final Design:
Funding:
ROW Acquisition:
Construction:
Color Key
SH 358 Ramp Reversal
Project Type: Operation ImprovementsAs part of the SH 358 ramp reversal improvements identified in the MTP, additional access road queuing lengths and signalization improvements at SH 358/South Staples Street would improve traffic flow and reduce delay in the vicinity of the freeway.
Project Details
- CSJ Number(s) or MTP Reference Numbers: 061701170
- Cost Estimate: $42,700,000
- Let Date: FY 2017
- Completion Date: 2023
- Project Data last modified: February 9, 2023
Regionally:
No improvements are currently planned.
Planned for Transit:
No improvements are currently planned.
Project Stage Status Key
— Not Begun — Complete — In Progress — Stalled